Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberNAF16-00023
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 5024 W CHINDEN BLVD
Project NameWEST VET EMERGENCY CNTR
Customer Number 
ePlanReviewNo
Description
[West Vet Emergency Center]
The fire sprinkler scope of work consists of protecting a two level veterinarian hospital. The 6” riser supplies a 2 ½” back flow and riser. The riser has two 2 ½” wet system and one 2 ½” dry system. The dry system is for a small canopy. Both floors are designed as a 2 ½”x2 ½”x 1 ¼” grid.

The underground piping is under permit NAF16-00019

(WEST VET) Permit for the construction of a new 32,170 sq. ft. two story building with 16,186 sq. ft. on the first story and 15,984 sq. ft. on the second story. The first story includes animal care and reception areas with the second story consisting of office, animal care, employee locker room an A-3 training room and two sleeping units. The building will be fully fire sprinklered for allowable area increase and is also required due to the inclusion of sleeping units. The building is to be equipped with a voice alarm system to allow for a reduction in the exit width from the second story per section 1005 2012 IBC. All work per the approved plans, any notation, attached engineering and the attached plan review report. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final11/18/201611/21/201611/21/2016PPASS
DetailsKatie Marron
Previous correction items completed. Air Test was completed on 9/20/16. System test completed satisfactory. Scope of work complete. Permit Finaled.
INSP-Final11/16/201611/18/201611/18/2016ACANC
DetailsKatie Marron
Rescheduled with Alarm vendor for Monday afternoon.
INSP-Sprinkler Rough-in/Hydro11/1/201611/2/201611/2/2016APASS
DetailsKatie Marron
Hydrostatic test on all three systems completed satisfactory. Remaining rough in areas completed satisfacory.
Still Pending:
-dry system 24 hr air test.
- 2nd floor protector on upright
- 2nd flr mechanical room spaced with 5' verify there is an obstruction to warrant
- 2nd floor missing hangar at apartments
INSP-Sprinkler Rough-in10/11/201610/12/201610/12/2016APART
DetailsKatie Marron
Rough-in inspection for grid ceiling areas:
-verified 'OK' north stairwell 2nd floor
-verified 'OK' first floor with exception of a dozen drops that were not in yet (heads were circled on drawings)
-verified 'ok' center office spacing issue previously noted.

Still Pending:
- 2nd flr Drop ceiling for hallway in front of elevator and apartments
- 2nd floor protector on upright
- 2nd flr mechanical room spaced with 5' issue
- 1st flr dozen of drop ceiling drops
INSP-Sprinkler Rough-in/Hydro9/19/20169/20/20169/20/2016PDONE
DetailsKatie Marron
24 hour air test on the dry system completed satisfactory.

Verified missing siesmic bracing was installed. Front canopy ok to cover.
INSP-Sprinkler Rough-in/Hydro9/19/20169/19/20169/19/2016PPART
DetailsKatie Marron
24 hour air test on dry system, 43.5 psi @ 2pm on 9/19/16

-Verified the rest of the dry pipe system, missing two seismic braces at elbow to canopy.
- Verified drop ceiling coverage 2nd flr in conference room and center office space, a room was added to the west side of this space and messed up sprinkler coverage(plans noted)
-Drop ceiling for hallway in front of elevator and apartments on 2nd flr still pending.
-Coverage in operating rooms 1st flr, uprights were added, "OK"
INSP-Sprinkler Rough-in9/1/20169/6/20169/6/2016APART
DetailsKatie Marron
2nd floor ceiling grid drops inspected, except for large conference rooms and a couple other areas which had no grids installed (see plans).
1st floor hardlids ok to cover. All mains and branch lines inspected (hangars & bracing). Dry system to point marked on plans verified.

The following previously noted items were corrected: kennel modification area and storage drop.
INSP-Sprinkler Rough-in7/19/20167/20/20167/20/2016APART
DetailsKatie Marron
Rough-in inspection of second floor conducted. Hard lid areas (i.e, bathrooms) ok to cover. All mains, branch lines and bracing OK. A few issues are:
-uprights spaced within 5' in mechanical room
-kennel space shifted so uprights and pendants need to be shifted (see plans)
-drop for storage space not cut in
-one upright has protector still on

Sprinkler spacing for pendants will need to be verified.
Sprinkler Plan Check3/31/2016 3/31/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/31/2016 DONE
Permit Ready to Issue  3/31/2016 DONE
Issue and Courier  3/31/2016 DONE
Plan resubmittals received  3/23/2016 DONE
resubmittals received 4 permit apps w/fire flow calcs & 4 sets of sheet FP-1, FP-2 & FP-3-put in cubby for Tim F
Telephone call  3/22/2016 DONE
called to let know permit plan review failed and that the plans were going to NACFR-left message on machine
1st review completed  3/21/2016 FAIL
Sprinkler Plan Check3/21/2016 3/21/2016 FAIL
DetailsTim Frost
Plan assigned to (Tim)3/21/2016 3/21/2016 FAIL
DetailsTim Frost
CHANGE STATUS TO (REV)  3/17/2016 DONE
was issued by mistake
Application received  3/10/2016  
Permit Ready to Issue  3/10/2016 DONE
Issue and Courier  3/10/2016 DONE
Plan assigned to (Tim)3/10/2016    
DetailsTim Frost