INSP-Final | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Katie Marron
|
|
|
Verified weatherproof strobes in restrooms and tested function. Scope of work complete. Permit Finaled.
|
INSP-Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PART |
Jim Page
|
|
|
Duct detector operation/HVAC unit shutdown verified. Audio visual devices tested, A/V's in restrooms need to be weather-proof devices due to the exposure of moisture from the shower. Contractor will schedule a final inspection when weather-proof devices are installed.
|
Application received | | | 4/7/2016 | | |
|
|
|
|
1st review completed | | | 4/7/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 4/7/2016 | | 4/7/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/7/2016 | | DONE |
|
|
|
Plans approved with review comments and drawing notation.
|
Permit Ready to Issue | | | 4/7/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 4/7/2016 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/7/2016 | | | | |
Lee G Meredith
|
|
|
|