INSP-Final | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Katie Marron
|
|
|
Verified previous items. Scope of work complete. Permit Finaled.
|
INSP-Final | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | FAIL |
Katie Marron
|
|
|
Verified all devices. Xray room missing a device, device on balcony was not functioning, and pressure switch on dry system not connected to bell. Smokes at main panel and riser room to be tested as well.
-RTU detectors were tested, OK -Elevator recall tested, OK -All Tampers, Flows tested
|
INSP-Final | 11/16/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Katie Marron
|
|
|
All previous correction items were completed. Air Test had been completed previously on 9/20/16. System test completed satisfactory. Scope of work complete. Permit Finaled.
|
INSP-Final | 11/16/2016 | 11/18/2016 | 11/16/2016 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 5015792 >> Inspection requested via mobile web by Dirk Inspection cancelled via mobile web on Wednesday, November 16, 2016.
|
Miscellaneous action | | | 11/16/2016 | | DONE |
|
|
|
Received an updated drawing showing the fire alarm panel being relocated from the basement to the first floor. Drawing added to documents.
|
Miscellaneous action | | | 4/21/2016 | | DONE |
|
|
|
Shelly emailed to say that she will be out of the office on 4-21 so she contacted the applicant to let them know they could directly resubmit corrections to PDS.
|
Plan resubmittals received | | | 4/21/2016 | | DONE |
|
|
|
|
Alarm Plan Check | 4/21/2016 | | 4/21/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/21/2016 | | DONE |
|
|
|
Approved resubmittal taken to Candy for return to NACFR.
|
Permit Ready to Issue | | | 4/21/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 4/21/2016 | | DONE |
|
|
|
sent to NACFR thru inner office mail
|
Telephone call | | | 4/20/2016 | | DONE |
|
|
|
talked to Rob at Protex to let know the plan review failed and that he could pick them up at NACFR
|
Miscellaneous action | | | 4/19/2016 | | DONE |
|
|
|
Morgan informed that the drawings he submitted were not printed to scale. New, scaled drawings were delivered to PDS on 4-19-16.
|
1st review completed | | | 4/19/2016 | | FAIL |
|
|
|
See 1st review comments.
|
Miscellaneous action | | | 4/19/2016 | | DONE |
|
|
|
Emailed review comments to Morgan and to Shelly Young.
|
Application received | | | 4/14/2016 | | |
|
|
|
|
Plan assigned to (Lee) | 4/14/2016 | | | | FAIL |
Lee G Meredith
|
|
|
|