INSP-Final | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Troy Cobbley
|
|
|
Final inspection passed.
|
Meeting | | | 6/30/2017 | | DONE |
|
|
|
The general contractor has requested a TCO for one tenant to move into the residence over the weekend. The fire alarm system has not been completely tested or inspected under the fire alarm permit (NAF17-00002) due to neccesary fire alarm plan modifications. The fire sprinkler system and life safety inspections have occurred and are satisfactory. The fire marshal can support the request for TCO under the condition a dedicated 24 hour fire watch be employed to monitor the partially occupied building area of the new addition until the fire alarm system can be re-inspected by the PDS/Fire inspector. The fire alarm vendor will need to conduct pre-testing of the fire alarm system prior to requesting final inspection, due to the necessary fire alarm system modifications.
|
DOC - Permit Finaled | | | 6/30/2017 | | DONE |
Troy Cobbley
|
|
|
per Troy C final inspection passed - he asked me to doc final it
|
INSP-Conference | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | DONE |
Scott Arellano
|
|
|
Discussed placement of exit signs within new enclosed courtyard. Advised electrician to place exit signs at two locations, similiar to existing east courtyard arrangment.
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/7/2016 | | DONE |
|
|
|
plan mod (user design modification) done-emailed Shelley
|
CHANGE STATUS TO (REV) | | | 9/7/2016 | | |
Katie Marron
|
|
|
The applicants submitted a plan modification for the corresponding project. Please review the mostly recently uploaded drawings and/or documents. I'm reassigning your department a task to ensure nothing has changed since your initial review AND that your notes are on the most recent version (if applicable).
|
Plan assigned to (Katie) | 9/7/2016 | | 9/7/2016 | | PASS |
Katie Marron
|
|
|
Modifications reviewed. Scope updated on report.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 7/15/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 7/15/2016 | | DONE |
|
|
|
|
Plan assigned to (Katie) | 7/14/2016 | | 7/14/2016 | | PASS |
Katie Marron
|
|
|
Revised plans received, updated report attached to case.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2016 | | DONE |
|
|
|
Plans approved, ready to issue/fee.
|
Miscellaneous action | | | 6/28/2016 | | DONE |
Scott Arellano
|
|
|
For the 2nd time, emailed Architect (David Ruby) Plan review report with correction items.
|
Plan assigned to (Scott) | 5/27/2016 | | 5/31/2016 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
1st review completed | | | 5/31/2016 | | FAIL |
|
|
|
Failed.
|
Application received | | | 5/27/2016 | | |
|
|
|
|