INSP-Final | 7/11/2016 | 7/13/2016 | 7/13/2016 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit finaled.
|
INSP-Final | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for a rough to cover. Piping is ok to cover and can be finaled when the ceiling tile has been installed
|
Plan Modification Accepted | | | 6/29/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/29/2016 | | 6/29/2016 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/29/2016 | | 6/29/2016 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/29/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 6/29/2016 | | DONE |
|
|
|
sent to NACFR thru inner office mail
|
Plan resubmittals received | | | 6/27/2016 | | DONE |
|
|
|
resubmittals recieved 1 set of sheet FP-1 and hydraulic calcs-put in cubby for Tim Frost-also emailed Shelley that there was only one set
|
Sprinkler Plan Check | 6/23/2016 | | 6/23/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/23/2016 | | FAIL |
|
|
|
|
Plan assigned to (Tim) | 6/23/2016 | | 6/23/2016 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 6/23/2016 | | DONE |
|
|
|
called-talked to Kay-told her the plan review failed and tht we were sending permit app back to NACFR
|
Application received | | | 6/22/2016 | | |
|
|
|
|
Plan assigned to (Tim) | 6/22/2016 | | | | |
Tim Frost
|
|
|
|