INSP-Final | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit Finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | PASS |
Katie Marron
|
|
|
Rough-in completed satisfactory. Two Sprinklers under stairs not in, stairs are not finished at this time.
|
INSP-Sprinkler Rough-in | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | CANC |
Katie Marron
|
|
|
No rough-in completed.
|
Plan assigned to (Tim) | 11/10/2016 | | 11/10/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/10/2016 | | 11/10/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/10/2016 | | DONE |
|
|
|
plan mod was sent back to Shelley @ NACFR
|
Plan Modification Accepted | | | 11/8/2016 | | DONE |
|
|
|
Shelley sent over a plan mod-received 4 sheets of FP1 & 4 sets of calcs-put it in the cubby for Tim Frost
|
INSP-Sprinkler Rough-in | 10/28/2016 | 11/1/2016 | 11/1/2016 | P | PART |
Katie Marron
|
|
|
Inspection for hard lids areas of yoga room/mezzanine and three rooms below mezzanine. OK to cover.
|
1st review completed | | | 9/23/2016 | | PASS |
|
|
|
|
Sprinkler Plan Check | 9/23/2016 | | 9/23/2016 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/23/2016 | | 9/23/2016 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/23/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 9/23/2016 | | DONE |
|
|
|
sent an email to Shelley so she'd know it was heading her way
|
Plan assigned to (Tim) | 9/21/2016 | | 9/21/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/13/2016 | | |
|
|
|
|
Plan assigned to (Tim) | 9/13/2016 | | | | |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/8/2016 | | | | |
Tim Frost
|
|
|
|