INSP-Final | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit finaled.
|
INSP-Final | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | CANC |
Katie Marron
|
|
|
Not ready for final. Per review report need sprinkler heads in basement approved/listed for current unfinished ceiling.
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PART |
Katie Marron
|
|
|
Hydrostatic test completed satisfactory. Rough-in of basement completed.
*Need to verify if sprinkler head type needs to be changed in basement do to partial finished status*
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2016 | 11/30/2016 | 11/30/2016 | A | PART |
Katie Marron
|
|
|
Rough-in for 1st and 2nd floor completed satisfactory. At time of inspection tenting completed OK.
No hydro complete. Rise still to be installed.
|
Miscellaneous action | | | 11/28/2016 | | DONE |
|
|
|
This project was delayed in the review process. A different pump had to be selected and various pieces of information was missing and had to be provided by the fire protection contractor.
|
Sprinkler Plan Check | 11/28/2016 | | 11/28/2016 | | PASS |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 11/28/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/28/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 11/28/2016 | | DONE |
|
|
|
emailed Shelley and put in inner office mail to go to NACFR
|
Miscellaneous action | | | 11/22/2016 | | DONE |
|
|
|
Sent Randy an email reminding him, I am still waiting on the pump information for this project.
|
Plan resubmittals received | | | 11/15/2016 | | DONE |
|
|
|
resubmittals recieved 4 sets of hydraulic calcs, 4 sheets of FP-1, 1 cover sheet &1 plan review sheet-and put in cubby for Tim F
|
Plan assigned to (Tim) | 10/5/2016 | | 10/5/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/5/2016 | | 10/5/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/5/2016 | | FAIL |
|
|
|
|
Miscellaneous action | | | 10/5/2016 | | DONE |
|
|
|
Emailed contractor review
|
Miscellaneous action | | | 10/5/2016 | | DONE |
|
|
|
emailed Shelley-that the failed plans were headed back her way
|
Application received | | | 10/3/2016 | | |
|
|
|
|
Plan assigned to (Tim) | 10/3/2016 | | | | |
Tim Frost
|
|
|
|