Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberNAF16-00072
StatusFinaled
Name CAFCO INC
Site Address 6715 W STATE ST
Project NameGAR2017-0040VIEW POINT WINDO
Customer Number 
ePlanReviewNo
Description
GAR17-0040/BLDFY2017-0040 Permit to construct a new 9,900 sq.ft. one story building. The building will be divided into two tenant spaces; one retail or office, the other space will be a warehouse for windows. Warehouse TI is included with this permit; other side will remain a shell.

4/16/2019-Plan mod to add office space on south end of core/shell area. Restroom and small office/conference room to open office area.

06/17/2019-Plan mod to add architect stamp to prints.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final6/11/20206/12/20206/12/2020ADONE
DetailsTroy Cobbley
Life safety passed.

Call prior to going Phone #: 2087131061 >> Inspection requested via mobile web by Bill
DOC - Permit Finaled  6/12/2020 DONE
per troy c
INSP-Conference5/29/20205/29/20205/29/2020PDONE
DetailsTroy Cobbley
Darren and I went over life safety requirements. Still missing the approved plans.
INSP-Final3/3/20203/4/20203/4/2020AFAIL
DetailsTroy Cobbley
Need city approved plans and small documents on site. The inspection turned into a conference on items needs for a life safety final.

Call for access Phone #: 2082836888 >> Inspection requested via mobile web by Darren
Staff review6/14/20196/14/20196/17/2019 PASS
DetailsMark Scharfen
Completed plan mod 06.17.2019-1 hour total time spent on plan mod.
Plan assigned to (Scharfen)6/14/2019 6/17/2019 PASS
DetailsMark Scharfen
06.17.2019-Completed review of plan mod. Uploaded rev_fire 06.17.2019.pdf.
PLANS/APPL TAKEN TO FRONT DESK  6/17/2019 DONE
DetailsMark Scharfen
Permit Ready to Issue  6/17/2019 DONE
CHANGE STATUS TO (ISS)  6/17/2019 DONE
emailed Shelley that the pkan mod was complete and that there was a 1hr plan mod review time
Plan Modification Accepted  6/12/2019 DONE
Staff review5/24/20195/24/20195/24/2019 DONE
DetailsMark Scharfen
plan mod-1 hour.
Plan assigned to (Scharfen)5/24/2019 5/24/2019 DONE
DetailsMark Scharfen
plan mod from 5/21/19 no changes to fire code report. Complete.
Permit Ready to Issue  5/24/2019 DONE
plan mod-1 hr review time
CHANGE STATUS TO (ISS)  5/24/2019 DONE
plan mod-1 hr plan review time-emailed Shelley
Plan Modification Accepted  5/24/2019 DONE
plan mod in Garden Cities e plan
Staff review4/16/20194/16/20194/16/2019 DONE
DetailsMark Scharfen
IFC Review complete. 2 hours on resubmittal.
Plan Modification Accepted  4/16/2019  
plan mod-assigned to MS
Plan assigned to (Scharfen)4/16/2019 4/16/2019 DONE
DetailsMark Scharfen
IFC Review 04.16.2019.pdf uploaded.
Permit Ready to Issue  4/16/2019 DONE
CHANGE STATUS TO (ISS)  4/16/2019 DONE
Plan assigned to (Erika)4/9/2019 4/16/2019 DONE
DetailsMark Scharfen
Staff review4/9/20194/9/20194/10/2019 DONE
DetailsMark Scharfen
Plan Mod-No review uploaded. 1 hour.
Plan Modification Accepted  4/9/2019 DONE
plan mod accepted in GC e plan-changes to pop outs around windows-assigned to EEA
Staff review9/24/20189/24/20189/24/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/24/2018 DONE
DetailsTim Frost
Permit Ready to Issue  9/24/2018 DONE
CHANGE STATUS TO (ISS)  9/24/2018 DONE
Plan resubmittals received  9/24/2018 DONE
Plan resubmittals received  9/10/2018 DONE
Resubmittal-was resubmitted in e plan on 9/7/18
Plan Modification Accepted  8/3/2018 DONE
plan mod in e plan-submitted a Grade Statement and A7.0 Struc Notes, VP03 const plans ST1, VP03 const plans ST2, VP03 water plans ST1, VP03 water plans ST2
Staff review6/25/20186/25/20186/29/2018 PASS
DetailsTim Frost
plan mod resubmitted through e plan

Not really sure why it was routed to fire. There was only some electrical changes.
PLANS/APPL TAKEN TO FRONT DESK  6/29/2018 DONE
Staff review6/8/20186/8/20186/8/2018 PASS
DetailsTim Frost
Permit Ready to Issue  6/8/2018 DONE
Issue and Courier  6/8/2018 DONE
emailed Shelley
Sprinkler Plan Check6/8/2018 6/8/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/8/2018 DONE
Telephone call  2/15/2018 DONE
DetailsScott Arellano
Spoke with Rick George (RDP). The provided fire flow is 1,500 gpm which remains below the required minimum 2,750 gpm needed for the proposed building. Rick indicated that fully fire sprinklering the building will need to occur to resolve this issue. He will resubmit the architectual cover sheet indicating the building to be fully fire sprinklered in accordance with NFPA 13. Rick will submit this revised plan to Garden City Development Services for distribution to the Building Official and NACFR.
Plan assigned to (Scott)2/6/2018 2/9/2018 FAIL
DetailsScott Arellano
Emailed architect plan review report. Attached report to e-case and permit case. report also went to Shelley @ NACFR
Plan resubmittals received  2/6/2018 DONE
resubmittals/plan mod received-attached revised permit-assigned to Scott A
Application received  10/19/2016  
Plan assigned to (Katie)10/19/2016 10/19/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
1st review completed  10/19/2016 FAIL
PLANS/APPL TAKEN TO FRONT DESK  10/19/2016  
Plan assigned to (Tim)9/10/2018    
DetailsTim Frost
Plan assigned to (Adele)6/25/2018    
DetailsAdele J Schaffeld-Griffin
plan mod submitted through e plan