INSP-Final | 9/1/2017 | 9/1/2017 | 9/1/2017 | A | DONE |
Troy Cobbley
|
|
|
permit finaled
|
DOC - Permit Finaled | | | 9/1/2017 | | DONE |
|
|
|
as per Troy Cobbley-permit final was done and passed so needs doc finaled to close permit
|
INSP-Supply line flush | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 7/11/2017 | 7/12/2017 | 7/12/2017 | P | CANC |
Troy Cobbley
|
|
|
Not ready for flush yet
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed. Flush was not ready
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/11/2017 | 7/11/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact is Scott Powada ###-#### he would like to do the Hydro and then the flush 2 hrs later if possible, please let him know if this can be done.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 4/19/2017 | 4/20/2017 | 4/20/2017 | P | PASS |
Troy Cobbley
|
|
|
Met Leroy Anderson on site and gave the underground supply piping the ok to cover.
|
Plan assigned to (Tim) | 3/21/2017 | | 3/23/2017 | | DONE |
Tim Frost
|
|
|
as per Tim
|
Plan assigned to (Katie) | 3/23/2017 | | 3/23/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/23/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/23/2017 | | DONE |
|
|
|
|
Issue and Courier | | | 3/23/2017 | | DONE |
|
|
|
emailed Shelley
|
Application received | | | 3/21/2017 | | |
|
|
|
|