INSP-Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled
|
DOC - Permit Finaled | | | 11/20/2017 | | DONE |
|
|
|
Doc Final Per Troy
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed and cage installed. Need insulation in crawl space to final.
|
INSP-Final | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide hydro test, provide cage for upright under stairs and provide the insulation in the crawl space.
|
INSP-Sprinkler Rough-in | 5/19/2017 | 5/22/2017 | 5/22/2017 | P | PASS |
Troy Cobbley
|
|
|
For todays inspection I verified that insulation had been installed at the deck above the sprinkler piping in the new area. Installation appeared adequate.
|
INSP-Final | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PART |
Scott Arellano
|
|
|
Ok to cover. Crawl space and roof overbuild areas with sprinkler protection to be tented and have acive heat sourced from warehouse and office areas. Final inspection will occur after finish is installed in office areas.
|
Plan assigned to (Tim) | 5/8/2017 | | 5/11/2017 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/11/2017 | | DONE |
|
|
|
The assitant fire marshal said the FDC does not need to be relocated to the front of the building, the existing location is fine.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2017 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 5/11/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/11/2017 | | 5/11/2017 | | PASS |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/11/2017 | | DONE |
|
|
|
|
Issue and Courier | | | 5/11/2017 | | DONE |
|
|
|
emailed Shelley that permit is in the inner office mail
|
Plan resubmittals received | | | 5/8/2017 | | DONE |
|
|
|
Resubmittals-kreceived 4 sets of computer designs, response letters, apps, sheets FP-1 & FP-2-put in cubby for Tim Frost
|
1st review completed | | | 5/4/2017 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 5/4/2017 | | 5/4/2017 | | FAIL |
Tim Frost
|
|
|
|
CHANGE STATUS TO (COL) | | | 5/4/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
CHANGE STATUS TO (REV) | | | 5/4/2017 | | DONE |
|
|
|
as per Tim Frost-change from COL to REV-was changed to COL by mistake
|
Miscellaneous action | | | 5/4/2017 | | DONE |
|
|
|
emailed Shelley that this failed and was on it's way back to her thru inner office mail
|
Application received | | | 5/3/2017 | | |
|
|
|
|