INSP-Final | 11/10/2017 | 11/13/2017 | 11/13/2017 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled
|
DOC - Permit Finaled | | | 11/13/2017 | | DONE |
|
|
|
Per Troy C to final out this permit
|
INSP-Supply line flush | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Troy Cobbley
|
|
|
Flush passed
|
INSP-Final | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | FAIL |
Troy Cobbley
|
|
|
For todays inspection I witnessed the flush of the underground and I verified the required flow. Solenoids controling the house water and irrigation had not been installed yet. The smoke alarms shall activate upon flow of sprinkler water.
|
INSP-Sprinkler Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in | 8/23/2017 | 8/24/2017 | 8/23/2017 | A | CANC |
Troy Cobbley
|
|
|
Plans are on site on the fire place Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
Plan assigned to (Tim) | 8/1/2017 | | 8/2/2017 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2017 | | DONE |
|
|
|
|
1st review completed | | | 8/2/2017 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 8/2/2017 | | DONE |
|
|
|
|
Issue and Courier | | | 8/2/2017 | | DONE |
|
|
|
Scott A emailed Shelley
|
Miscellaneous action | | | 8/1/2017 | | DONE |
|
|
|
emailed Shelley what the permit # is
|
Application received | | | 8/1/2017 | | |
|
|
|
|