INSP-Final | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled. A/v's have been syn'c and as-buiilts submitted
|
DOC - Permit Finaled | | | 10/4/2017 | | DONE |
|
|
|
Final Per Troy Cobbley
|
INSP-Alarm Testing | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | FAIL |
Troy Cobbley
|
|
|
Audibles are not sync't, two strobes did not function, no as-builts, delay egress doors are not tied into fire alarm system yet.
|
Permit Ready to Issue | | | 10/2/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/2/2017 | | DONE |
|
|
|
emailed Shelley that the plan mod was coming her way
|
Plan Modification Accepted | | | 9/29/2017 | | DONE |
|
|
|
plan mod dropped off by Absolute Fire Protection-Shelley was out today so one of the others in the office at NACFR ok'd Absolute to bring it here-took to Lee-no app to attach to documents
|
CHANGE STATUS TO (REV) | | | 9/29/2017 | | DONE |
|
|
|
|
1st review completed | | | 9/29/2017 | | PASS |
|
|
|
Added low frequency sounders to sleeping units.
|
Alarm Plan Check | 9/29/2017 | | 9/29/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/29/2017 | | DONE |
|
|
|
Taken to Candy for processing. No additional review comments.
|
INSP-Final | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | FAIL |
Troy Cobbley
|
|
|
There were no city approved plans or small documents on site for inspection. It appears that notification will need to be added in the corridor and in the common Shower Room. Also detection will need to be provided in the same Shower Room. Notification is shown in the corridor as existing but is not there. As-builts or Plan Mods will need to be provided to plan review. He will decide which will need to be provided.
|
Telephone call | | | 9/26/2017 | | DONE |
|
|
|
Mike from Absolute called regarding design changes noted by the inspector. I told him that due to the quantity of items plus the addidtion of a notification panel that a resubmittal will be required. Mike asked if heat detectors can be wall mounted. Informed him they could if located at least 4 inches from ceiling but no more than 12 inches per NFPA 72.
|
Telephone call | | | 9/26/2017 | | DONE |
|
|
|
Mary called to say that the added NAC panel was previously approved in a plan modification. If so, the contractor needs to have those approved plans on site for inspections. Also, if the approved plans show this, the addedf heat and notification in the shower room can be submitted in as built drawings.
|
INSP-Final | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | CANC |
Troy Cobbley
|
|
|
After ten am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | CANC |
Troy Cobbley
|
|
|
Tenting Phone #: ###-#### Inspection requested via web by Sam Ball
|
Permit Ready to Issue | | | 8/4/2017 | | DONE |
|
|
|
|
Issue and Courier | | | 8/4/2017 | | DONE |
|
|
|
put in inner office mail and email Shelley
|
Plan assigned to (Lee) | 8/1/2017 | | 8/3/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/3/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 8/3/2017 | | 8/3/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/3/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Miscellaneous action | | | 8/1/2017 | | DONE |
|
|
|
emailed Shelley what the permit # is
|
Application received | | | 8/1/2017 | | |
|
|
|
|