INSP-Final | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | DONE |
Troy Cobbley
|
|
|
Life safety passed
|
DOC - Permit Finaled | | | 11/22/2017 | | DONE |
|
|
|
per Troy C, doc final the permit.
|
Telephone call | | | 11/21/2017 | | DONE |
Scott Arellano
|
|
|
I spoke with Jeff Summers today about scheduling the fire/life safety field inspection for the Beardsmith in Garden City. Jeff mentioned that no fire sprinkler work was necessary so no separate fire protection permits were pulled. Jeff indicated that the state building inspector (Tom Abbott) mentioned the space was satisfactory in regards to fire sprinklers. Informed Jeff that is would be prudent to have the space evaluated by a licensed fire protection contractor prior to our scheduled field inspection, which includes the fire sprinkler system. However, Jeff is going to schedule our initial inspection first anyway.
|
Plan assigned to (Scott) | 10/6/2017 | | 10/9/2017 | | DONE |
Scott Arellano
|
|
|
Attached review to case
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2017 | | DONE |
|
|
|
|
Issue and Courier | | | 10/9/2017 | | DONE |
|
|
|
emailed to Shelley
|
Application received | | | 10/6/2017 | | |
|
|
|
|