INSP-Final | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
DOC - Permit Finaled | | | 8/2/2018 | | DONE |
|
|
|
per email from Troy C to final permit
|
INSP-Supply line flush | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
Please call Troy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed inspection.
|
INSP-Sprinkler Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line rough-in passed. Piping can be covered.
|
Sprinkler Plan Check | 12/22/2017 | | 12/22/2017 | | PASS |
Tim Frost
|
|
|
|
1st review completed | | | 12/22/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/22/2017 | | 12/22/2017 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/22/2017 | | DONE |
Christina Prado
|
|
|
|
Issue and Courier | | | 12/22/2017 | | DONE |
Christina Prado
|
|
|
emailed Shelley to advise plans are on the way
|
Application received | | | 12/20/2017 | | |
|
|
|
|
Plan assigned to (Tim) | 12/20/2017 | | | | |
Tim Frost
|
|
|
|