INSP-Final | 8/10/2018 | 8/10/2018 | 8/10/2018 | A | DONE |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
DOC - Permit Finaled | | | 8/10/2018 | | DONE |
|
|
|
|
Staff review | 6/13/2018 | 6/13/2018 | 6/13/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
No fire review required for changes made to civil sheets C5.5 and C5.1
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 6/13/2018 | | DONE |
|
|
|
emailed Shelley no fire review required
|
CHANGE STATUS TO (ISS) | | | 6/13/2018 | | DONE |
|
|
|
|
Miscellaneous action | | | 6/13/2018 | | DONE |
|
|
|
emailed Mary-not sure why GC's e plan was started-no new docs or drawings
|
Plan Modification Accepted | | | 6/13/2018 | | |
|
|
|
plan mod submitted sheets C5.01 & C5.50 in e plan-emailed Shelley and Adele assigned it to Staff review with no name
|
CHANGE STATUS TO (REV) | | | 6/13/2018 | | DONE |
|
|
|
plan mod submitted 2 sheets C5.50 & C5.01
|
Staff review | 6/8/2018 | 6/8/2018 | 6/8/2018 | | PASS |
Tim Frost
|
|
|
There were no changes from the previously approved review which had an impact on the fire code plan review,
|
Plan assigned to (Tim) | 6/8/2018 | | 6/8/2018 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 6/8/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2018 | | PASS |
|
|
|
There were no changes from the previously approved review which had an impact on the fire code plan review,
|
Permit Ready to Issue | | | 6/8/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/8/2018 | | DONE |
|
|
|
as per Tim F-permit is ready to change status back to issue-no plan review done on resubmittal/plan mod-emailed Shelley
|
Sprinkler Plan Check | 6/8/2018 | | 6/8/2018 | | PASS |
Tim Frost
|
|
|
|
Telephone call | | | 5/29/2018 | | DONE |
|
|
|
emailed Mary again on 5/29/18-need to know if this is a plan mod? if so what are the changes?
|
CHANGE STATUS TO (REV) | | | 5/29/2018 | | DONE |
|
|
|
Plan Mod came in threw e plan for Garden City-emailed Adele, Shelley & Erika.
|
Telephone call | | | 5/25/2018 | | DONE |
|
|
|
emailed Mary that this permit came in thru e plan and not sure if it's a new one or a plan mod or what
|
Plan assigned to (Scott) | 2/13/2018 | | 2/15/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/15/2018 | | DONE |
|
|
|
|
Issue and Courier | | | 2/15/2018 | | DONE |
|
|
|
Scott A emailed both Shelley and I
|
Plan resubmittals received | | | 2/13/2018 | | DONE |
|
|
|
resubmittal received revised app-assigned to Scott A
|
Application received | | | 2/6/2018 | | |
|
|
|
|