Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberNAF18-00007
StatusFinaled
Name HC COMPANY INC
Site Address 610 E 42ND ST
Project NameBLDFY2018-0058
Customer Number 
ePlanReviewNo
Description
BLDFY2018-0058 Permit to remodel existing kitchen and construct a new 6,600 sq.ft. addition which includes a cafeteria for use by Boys & Girls club and partner public schools. This building is fully fire sprinklered with a fire alarm system. Separate permits will be required for necessary modifications to the existing building fire protection systems, including any commercial kitchen hood suppression systems; as regulated by North Ada County Fire Protection District.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final8/10/20188/10/20188/10/2018ADONE
DetailsJim Page
Final life fire safety inspection complete.
DOC - Permit Finaled  8/10/2018 DONE
Staff review6/13/20186/13/20186/13/2018 PASS
DetailsAdele J Schaffeld-Griffin
No fire review required for changes made to civil sheets C5.5 and C5.1
PLANS/APPL TAKEN TO FRONT DESK  6/13/2018 DONE
DetailsAdele J Schaffeld-Griffin
Permit Ready to Issue  6/13/2018 DONE
emailed Shelley no fire review required
CHANGE STATUS TO (ISS)  6/13/2018 DONE
Miscellaneous action  6/13/2018 DONE
emailed Mary-not sure why GC's e plan was started-no new docs or drawings
Plan Modification Accepted  6/13/2018  
plan mod submitted sheets C5.01 & C5.50 in e plan-emailed Shelley and Adele assigned it to Staff review with no name
CHANGE STATUS TO (REV)  6/13/2018 DONE
plan mod submitted 2 sheets C5.50 & C5.01
Staff review6/8/20186/8/20186/8/2018 PASS
DetailsTim Frost
There were no changes from the previously approved review which had an impact on the fire code plan review,
Plan assigned to (Tim)6/8/2018 6/8/2018 DONE
DetailsTim Frost
Plan resubmittals received  6/8/2018 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/8/2018 PASS
There were no changes from the previously approved review which had an impact on the fire code plan review,
Permit Ready to Issue  6/8/2018 DONE
CHANGE STATUS TO (ISS)  6/8/2018 DONE
as per Tim F-permit is ready to change status back to issue-no plan review done on resubmittal/plan mod-emailed Shelley
Sprinkler Plan Check6/8/2018 6/8/2018 PASS
DetailsTim Frost
Telephone call  5/29/2018 DONE
emailed Mary again on 5/29/18-need to know if this is a plan mod? if so what are the changes?
CHANGE STATUS TO (REV)  5/29/2018 DONE
Plan Mod came in threw e plan for Garden City-emailed Adele, Shelley & Erika.
Telephone call  5/25/2018 DONE
emailed Mary that this permit came in thru e plan and not sure if it's a new one or a plan mod or what
Plan assigned to (Scott)2/13/2018 2/15/2018 PASS
DetailsScott Arellano
Attached comments to plans.
PLANS/APPL TAKEN TO FRONT DESK  2/15/2018 DONE
Permit Ready to Issue  2/15/2018 DONE
Issue and Courier  2/15/2018 DONE
Scott A emailed both Shelley and I
Plan resubmittals received  2/13/2018 DONE
resubmittal received revised app-assigned to Scott A
Application received  2/6/2018