INSP-Final | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled
Call prior to going Phone #: 2088706532 >> Inspection requested via mobile web by Roy Fouts
|
DOC - Permit Finaled | | | 7/31/2018 | | DONE |
|
|
|
per troy cobbley
|
Staff review | 7/27/2018 | 7/27/2018 | 7/30/2018 | | PASS |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/30/2018 | | 7/30/2018 | | PASS |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 7/30/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/30/2018 | | DONE |
|
|
|
per Tim F-no fees for as built
|
Issue and Courier | | | 7/30/2018 | | DONE |
|
|
|
emailed Shelley
|
Plan Modification Accepted | | | 7/27/2018 | | DONE |
|
|
|
plan mod (as built) accepted 4 Tyco packets and 4 FP1 & FP2-took to Tim F
|
INSP-Final | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final yet. Need tape removed from uprights in the Cafeteria and Restrooms, need pendant heads installed shown on plans in the Dry Storage Room, need verification of combustible concealed space coverage over the existing kitchen. Hydro test passed for the new Kitchen area.
Call prior to going Phone #: 2088901055 >> Inspection requested via mobile web by Zack Grasmick
|
INSP-Final | 7/18/2018 | 7/20/2018 | 7/20/2018 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final. Still need hydro test for the new piping in the Kitchen and the ceiling tile needs to be removed so that a rough-in inspection can be done for the sprinkler piping in the Kitchen. Need ceiling tile installed in the clouds in the Dining area and all of the upright sprinklers in the Dining need the covers off the sprinklers.
Call prior to going Phone #: 2088903587 >> Inspection requested via mobile web by Raul Munoz
|
INSP-Final | 7/18/2018 | 7/20/2018 | 7/18/2018 | P | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2088706532 >> Inspection requested via mobile web by Roy Fouts Inspection cancelled via mobile web on Wednesday, July 18, 2018.
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | PASS |
Troy Cobbley
|
|
|
Hydro test for the new piping in the Dining area passed.
Call prior to going Phone #: 2085611337 >> Inspection requested via mobile web by Gabe
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | FAIL |
Troy Cobbley
|
|
|
Hydro test failed again due to visible leak
Call prior to going Phone #: 2085611337 >> Inspection requested via mobile web by Gabe
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2018 | 6/11/2018 | 6/11/2018 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed due to puddle on floor and loss of pressure at the guage.
Phone #: 2088706532 >> Inspection requested via mobile web by Roy
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | PASS |
Troy Cobbley
|
|
|
The combustilbe concealed space above the Dining area Restrooms has been filled with insulation and is ok for coverl.
Call prior to going Phone #: 2088706532 >> Inspection requested via mobile web by Roy
|
INSP-Sprinkler Rough-in/Hydro | 5/29/2018 | 5/30/2018 | 5/31/2018 | P | CANC |
Troy Cobbley
|
|
|
Not ready for an inspection or hydro test yet. I noted non-rated wood being used which is creating combustible concealed spaces that do not have sprinkler protection.
Call prior to going Phone #: 2085611337 >> Inspection requested via mobile web by Gabe
|
Sprinkler Plan Check | 4/12/2018 | | 4/12/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2018 | | DONE |
|
|
|
|
Issue and Courier | | | 4/12/2018 | | DONE |
|
|
|
emailed Shelley that it was heading her way thru inner office mail-tomorrow
|
Plan resubmittals received | | | 4/11/2018 | | DONE |
|
|
|
resubmittal received in paper from NACFR
|
Plan assigned to (Erika) | 4/10/2018 | | 4/10/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 4/10/2018 | | FAIL |
Tim Frost
|
|
|
|
CHANGE STATUS TO (COL) | | | 4/10/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
CHANGE STATUS TO (REV) | | | 4/10/2018 | | DONE |
|
|
|
changed status from col to rev-Tim F changed status by mistake
|
Miscellaneous action | | | 4/10/2018 | | DONE |
|
|
|
emailed Shelley that the permit was on it's way back thru inner office mail and that it failed plan review
|
Application received | | | 4/5/2018 | | |
|
|
|
|
Plan assigned to (Tim) | 4/11/2018 | | | | |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/27/2018 | | | | |
Tim Frost
|
|
|
|