|
received three sets of response letter, suez fire flow letter, two sets email responses, projects specs & data sheet. Received 4 sets of revised plan sheets marked A0.01, a0.02a, a0.0b, a0.10, c1.00, c1.01, c2.00,c2.50, c2.51, c3.00, c4.00, c4.01, c4.50, c5.00, l1.00, l1.01, l1.02, l1.50, l2.00, l2.01, l2.02, l2.50, ae2.10, ae4.10, ae5.10, be4.10, be5.10, e1.00, e6.00 & e6.01; Plans stamped and taken to TRF for review
|