Permit NumberNAF18-00087
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 272 E 36TH ST
Project NameHERON RESIDENCE
Customer Number 
ePlanReviewNo
Description
[Heron Residence]
The fire sprinkler scope of work consists of a new single family three level home. The system has a home hydrant pump and tank system. The fire protection system utilizes CPVC piping and residential type sprinklers.

• This is a voluntary fire sprinkler system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final10/10/201810/10/201810/10/2018PDONE
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Anthony Minichiello
DOC - Permit Finaled  10/10/2018 DONE
per Troy C. doc final-he can't do that in the field
INSP-Final10/8/201810/8/201810/8/2018PFAIL
DetailsTroy Cobbley
Need the canopy put on the head in the upper level closet and a 175 degree head to be installed in the Laundry Room as per plan. When that is done we will need to test the fire pump. Also the sign, as per plan, needs to be installed at pump.


Call Anthony to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in7/27/20187/31/20187/31/2018APASS
DetailsTroy Cobbley
Tenting Inspection passed. Piping can be covered.
INSP-Sprinkler Rough-in7/27/20187/27/20187/27/2018PFAIL
DetailsTroy Cobbley
Todays inspection was for tenting. Half of the piping has already been covered with sheet rock so I can't check tenting. The half that has not been covered looks good. There were no ladders on site to get high enough to look across the ceiling.


Tenting inspection, ready when you have time. Thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in7/18/20187/18/20187/18/2018PPASS
DetailsTroy Cobbley
Rough-in passed. Spacing for pendant at stove will be checked at final. First and second floor piping can be covered but third floor can not until a tenting inspection has passed.

Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro7/12/20187/13/20187/13/2018PPART
DetailsTroy Cobbley
General rough-in for overhead pipe passed. I noted in the Kitchen area the pendant is not placed as per plan and may be too close to the oven when installed. I noted in the Dining room the pendant head is too far off of the stair wall (8' max.) and the stair landing at this same location has no sprinkler protection. Plans have been marked in red at corrections. First ansnd second floor piping can be covered but third floor piping can not until a tenting inspection has been passed. Heads have not been verified (no ladder) and neither has the pump/riser. The riser piping will need to be steel due to the cpvc piping is not listed to be more than 1 1/2" from walls.

Call ahead to coordinate time, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Staff review6/22/20186/22/20186/26/2018 PASS
DetailsTim Frost
Sprinkler Plan Check6/26/2018 6/26/2018 PASS
DetailsTim Frost
1st review completed  6/26/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/26/2018 DONE
DetailsTim Frost
Permit Ready to Issue  6/26/2018 DONE
Issue and Courier  6/26/2018 DONE
put in inner office mail to Shelley and email her
Miscellaneous action  6/22/2018 DONE
emailed Shelley
Application received  6/22/2018