INSP-Final | 8/16/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Troy Cobbley
|
|
|
*** Flow switch timed at 40 seconds*** Call prior to going Phone #: 2084212181 >> Inspection requested via mobile web by Brian
|
INSP-Final | 7/24/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Troy Cobbley
|
|
|
**Hydro passed at well pump pressure. Bell needs to be mounted in relocated location I marked on approved plans, Not at the location submitted. Some patching needs to be done around escutcheons, and all painting needs to be completed before final inspection. MAS***
Call prior to going Phone #: 2084212181 >> Inspection requested via mobile web by Brian
|
INSP-Final | 7/15/2019 | 7/17/2019 | 7/17/2019 | P | CANC |
Troy Cobbley
|
|
|
Cancel per contractor. Water connection not done yet.
Call prior to going Phone #: 2084212181 >> Inspection requested via mobile web by Brian Rumple
|
INSP-Sprinkler Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping is ok for cover.
Call prior to going Phone #: 2086956553 >> Inspection requested via mobile web by John Venche
|
INSP-Sprinkler Rough-in | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed. All piping, except as marked on the approved plans, can be covered. Tenting passed. Builder is going to add insulation in the garage area.
Call prior to going Phone #: 2086956553 >> Inspection requested via mobile web by John
|
INSP-Sprinkler Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2086956553 >> Inspection requested via mobile web by John Inspection cancelled via mobile web on Tuesday, January 22, 2019.
|
Staff review | 1/15/2019 | 1/15/2019 | 1/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
No fee for as built drawings
|
Plan assigned to (Stumbaugh) | 1/10/2019 | | 1/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/14/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/14/2019 | | DONE |
|
|
|
as per Mark Strumbaugh-no charge for the plan mod-emailed Shelley permit was ready
|
Plan Modification Accepted | | | 1/10/2019 | | DONE |
|
|
|
As built
|
INSP-Sprinkler Rough-in | 12/18/2018 | 12/20/2018 | 12/20/2018 | P | FAIL |
Troy Cobbley
|
|
|
Was only able to do a partial inspection due to numerous pipe routing changes. I also noted that alot of additional fittings have been added that might affect the hydraulic calculations. I also noted tenting issues in the garage area. Contractor will need to contact plan review and see if as-builts or plan modifications are required. This will need to be done prior to another inspection being scheduled. Per the general contractor blow-in insulation will be used above the ceilings in the garage.
Call prior to going Phone #: 2084212181 >> Inspection requested via mobile web by Brian
|
Staff review | 12/3/2018 | 12/3/2018 | 12/3/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 12/3/2018 | | 12/3/2018 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 12/3/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/3/2018 | | DONE |
|
|
|
|
Issue and Courier | | | 12/3/2018 | | DONE |
|
|
|
emailed Shelley permit was issued
|
Miscellaneous action | | | 11/29/2018 | | DONE |
Tim Frost
|
|
|
Sent the following email based on Well supplier letter.
IHowever, you are still good 26 Gpm @ 54 Psi. The pump supplier is saying there is 54 Gpm @ 60 Psi.
The pump curve I found indicates 350’ (151 Psi) of Head at 26 Gpm. Pump set depth is 127’. So elevation loss would be 55 Psi.
The well could have as much as 96 Psi available but he says it is set at 130 Psi. Even with that, there should be 75 Psi available. He also indicates he flowed 54 Gpm for over an hour.
So I do not see a problem
Thank you for your time and help in this matter.
|
Plan resubmittals received | | | 11/29/2018 | | DONE |
|
|
|
Resubmittals recieved 4 sets of AFSS reports, FP1 both sheets 1 of 2 and 2of 2- took to Tim F
|
Staff review | 11/2/2018 | 11/2/2018 | 11/8/2018 | | FAIL |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 11/2/2018 | | DONE |
|
|
|
Four copies of each fire protection packages and plans, stamped and taken to Tim F
|
Staff review | 10/17/2018 | 10/17/2018 | 10/24/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/24/2018 | | DONE |
|
|
|
emailed Shelley that the plan review failed
|
Miscellaneous action | | | 10/17/2018 | | DONE |
|
|
|
Emailed Shelley permit number.
|
Application received | | | 10/17/2018 | | |
|
|
|
|
Plan assigned to (Tim) | 10/17/2018 | | | | |
Tim Frost
|
|
|
|