INSP-Sprinkler Rough-in/Hydro | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test witnessed with no visible pressure loss at the guage.
Call prior to going Phone #: 7753857345 >> Inspection requested via mobile web by Roy Nelsen
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2019 | 3/13/2019 | 3/13/2019 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed again due to visible loss on guage.
Call prior to going Phone #: 7753857345 >> Inspection requested via mobile web by Roy Nelsen
|
INSP-Sprinkler Rough-in/Hydro | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro failed due to visible loss on pressure guage.
Call prior to going Phone #: 7753857345 >> Inspection requested via mobile web by Roy Nelsen
|
INSP-Sprinkler Rough-in/Hydro | 3/8/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the Riser room and piping can be covered. Dry pendant has been relocated in the northwest canopy. Not ready for hydro until water is turned on.
|
INSP-Sprinkler Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2083621888 >> Inspection requested via mobile web by Dan
|
INSP-Sprinkler Rough-in | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. One dry pendant is overspaced on the west end of the north side exterior soffit.
As late as possible Phone #: 2083621888 >> Inspection requested via mobile web by Dan Buccino
|
INSP-Sprinkler Rough-in | 3/4/2019 | 3/6/2019 | 3/5/2019 | A | CANC |
Troy Cobbley
|
|
|
As early as possible Phone #: 7753857345 >> Inspection requested via mobile web by Roy Inspection cancelled via mobile web on Tuesday, March 05, 2019.
|
INSP-Sprinkler Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Troy Cobbley
|
|
|
Todays inspection was for hanger placement prior to covering by foam insulation. Hangers appear ok. Call prior to going Phone #: 2088719664 >> Inspection requested via mobile web by Jeff
|
Permit Ready to Issue | | | 2/28/2019 | | DONE |
|
|
|
|
Issue and Courier | | | 2/28/2019 | | DONE |
|
|
|
emailed Shelley that the permit was issued and in the inner office mail
|
Staff review | 2/27/2019 | 2/27/2019 | 2/27/2019 | | PASS |
Mark Stumbaugh
|
|
|
Total review time 2.5hrs
3rd resubmittal-1 hr review
|
Miscellaneous action | | | 2/27/2019 | | DONE |
|
|
|
emailed Shelley that we received the resubmittals and took to MAS
|
Plan resubmittals received | | | 2/27/2019 | | DONE |
|
|
|
3rd resubmittal-received 3 apps, 3 plan reviewer, 3 hydra calcs, FP1, FP2 & FP3-took to Mark Stumbaugh
|
Staff review | 2/21/2019 | 2/21/2019 | 2/21/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Corrections needed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 2/21/2019 | | DONE |
|
|
|
emailed Shelley that the plan review failed
|
CHANGE STATUS TO (REV) | | | 2/21/2019 | | DONE |
|
|
|
should be in REV status, permit never issued and failed review
|
Plan resubmittals received | | | 2/19/2019 | | DONE |
|
|
|
resubmittals received 4 sets of hydraulic calcs, 4 each of sheets FP1,FP2,FP3 & Took to Mark Stumbaugh
|
Staff review | 1/23/2019 | 1/23/2019 | 1/31/2019 | | FAIL |
Mark Stumbaugh
|
|
|
corrections needed. see plan review
|
Plan assigned to (Stumbaugh) | 1/23/2019 | | 1/31/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 1/23/2019 | | |
|
|
|
|
Miscellaneous action | | | 1/23/2019 | | DONE |
|
|
|
emailed Shelley permit number
|
Plan assigned to (Stumbaugh) | 2/19/2019 | | | | |
Mark Stumbaugh
|
|
|
|