INSP-Final | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
DOC - Permit Finaled | | | 10/8/2019 | | DONE |
|
|
|
Per Troy C, 10/8/19
|
INSP-Final | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Can final when heat is provided and the plastic is attached to the trusses (repaired) and insulation is provided at these patched areas. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PART |
Troy Cobbley
|
|
|
Sprinkler work is complete. Temporary per Boise Fire. Permit can be finaled when the shell/core permit is finaled.
Call prior to going Phone #: 2089148171 >> Inspection requested via mobile web by Brian
|
INSP-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | FAIL |
Troy Cobbley
|
|
|
There were problems with the fire alarm system which prevented testing of the sprinkler system. No testing performed. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered. Original entry made under NAF19-00019. Phone #: ###-#### Inspection requested via web by Sam Ball
|
Staff review | 3/1/2019 | 3/1/2019 | 3/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/1/2019 | | 3/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/26/2019 | | DONE |
|
|
|
|
Issue and Courier | | | 3/26/2019 | | DONE |
|
|
|
emailed Shelley that the permit was ready-she will send someone over to pick it up-Shelley emailed back to send them to her through inner office mail,,,so i did
|
Miscellaneous action | | | 3/1/2019 | | DONE |
|
|
|
emailed Shelley the ste # and NAF # and app
|
Application received | | | 3/1/2019 | | |
|
|
|
|