INSP-Final | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | DONE |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection for area of work complete.
Will be done by3:30pm Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic for overhead fire sprinkler piping modifications complete, no pressure loss observed.
|
DOC - Permit Finaled | | | 10/25/2019 | | DONE |
|
|
|
per jim page
|
Staff review | 10/24/2019 | 10/24/2019 | 10/24/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Staff review | 10/24/2019 | 10/24/2019 | 10/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
Review Time 2hr
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 10/24/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 10/24/2019 | | DONE |
|
|
|
emailed Shelley
|
Plan assigned to (Stumbaugh) | 10/22/2019 | | 10/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 10/22/2019 | | DONE |
|
|
|
Stamped Cover of each set and taken to MAS
|
INSP-Final | 10/11/2019 | 10/14/2019 | 10/15/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 10/11/2019 | 10/14/2019 | 10/15/2019 | P | FAIL |
Troy Cobbley
|
|
|
Per the state of idaho and the boise fire dept the fier sprinkler system/addition is required to meet mimimum code as adopted by the state of idaho. All corrections as noted need to be addressed which include plan modifications for pipe size changes, pipe routing changes, obstructions, combustible concealed spaces, hanger issues, branch line restraint issues.....ect
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final | 10/11/2019 | 10/14/2019 | 10/11/2019 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 10/11/2019 | 10/14/2019 | 10/11/2019 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Final | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2089148171 >> Inspection requested via mobile web by Brian
|
Staff review | 8/2/2019 | 8/2/2019 | 8/2/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/2/2019 | | 8/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 8/2/2019 | | DONE |
|
|
|
emailed Shelley the app and NAF permit #
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
|
Permit Ready to Issue | | | 8/2/2019 | | DONE |
|
|
|
|
Issue and Courier | | | 8/2/2019 | | DONE |
|
|
|
emailed Shelley that the permit was in the inner office mail to come back to her
|
Application received | | | 8/2/2019 | | |
|
|
|
|