INSP-Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled.
Cal Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
DOC - Permit Finaled | | | 11/26/2019 | | DONE |
|
|
|
per troy
|
INSP-Final | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | CANC |
Troy Cobbley
|
|
|
Call Anthony before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in, tenting and hydro passed. Piping is ok for cover. Well supply piping not provided yet.
Call prior to going Phone #: 2083910988 >> Inspection requested via mobile web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed. Tenting has not been completed above the stairs at the second floor. Tenting passed in other areas. Piping can be covered except at the second floor stairs. No water supply yet. No hydro yet.
Call prior to going Phone #: 2083910988 >> Inspection requested via mobile web by Anthony
|
Plan assigned to (Lee) | 8/28/2019 | | 8/29/2019 | | DONE |
Mark Stumbaugh
|
|
|
as built-1 hr plan review time
|
Plan Modification Accepted | | | 8/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/29/2019 | | 8/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/29/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/29/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2019 | | DONE |
|
|
|
emailed Shelley that permit status was changed to ISS-and fowarded the permit that Mark Stumbaugh sent me
|
Telephone call | | | 8/29/2019 | | DONE |
|
|
|
called Thorpe-talked to Alicia-let know as built is ready and they cone come here to pick up-Shelley at NACFR is on vacation-took plans to Tiffany
|
Telephone call | | | 8/29/2019 | | DONE |
|
|
|
emailed Shelley that the as built was done-and i called Alicia @ Thorpe to come pick up here- took to Tiffany's desk
|
Miscellaneous action | | | 8/28/2019 | | DONE |
|
|
|
emailed Shelley the as built app and permit #
|
Plan resubmittals received | | | 8/28/2019 | | DONE |
|
|
|
as built-assigned to Lee M
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need as-built/plan mods showing the actual pipe routing, need the riser piping addressed that is exposed as discussed, need tenting inspection. No piping can be covered.
Call prior to going Phone #: 2083910988 >> Inspection requested via mobile web by Anthony
|
Staff review | 8/8/2019 | 8/8/2019 | 8/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/8/2019 | | 8/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
Total review time 1.5hr
|
Permit Ready to Issue | | | 8/15/2019 | | DONE |
|
|
|
|
Issue and Courier | | | 8/15/2019 | | DONE |
|
|
|
emailed Shelley taht the permit was issued and in the inner office mail to come back the them
|
Miscellaneous action | | | 8/8/2019 | | DONE |
|
|
|
emailed Shelley the NAF #
|
Application received | | | 8/8/2019 | | |
|
|
|
|