INSP-Final | 10/1/2019 | 10/3/2019 | 10/3/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled. RUDY CATIC Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Remaining piping can be covered. Call Jeff if there are questions. Thanks Phone #: ###-#### Inspection requested via web by Jeff Packham
|
DOC - Permit Finaled | | | 10/3/2019 | | DONE |
|
|
|
per troy cobbley
|
INSP-Sprinkler Rough-in | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the piping in the east restroom that is ok for cover.
RANDY COURTWRIGHT Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Staff review | 8/22/2019 | 8/22/2019 | 8/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/22/2019 | | 8/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 8/22/2019 | | DONE |
|
|
|
emailed Shelley the NAF # and app-also told her in email that i removed the permit apps that belonged to city of boise
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
|
Permit Ready to Issue | | | 8/22/2019 | | DONE |
|
|
|
|
Issue and Courier | | | 8/22/2019 | | DONE |
|
|
|
called and left message on ###-#### that the permit is ready-Shelley is out of the office so i told them to pick it up here. It will be at my desk
|
Application received | | | 8/22/2019 | | |
|
|
|
|