Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberNAF19-00085
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 5739 N COFFEY ST Unit: LOT 12
Project NameGC
Customer Number 
ePlanReviewNo
Description
NEW SINGLE FAMILY DWELLING TO HAVE NEW 13D FIRE SPRINKLER SYSTEM INSTALLED BY THORPE FIRE SPRINKLER SYSTEMS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final4/23/20204/24/20204/24/2020ADONE
DetailsTroy Cobbley
Permit finaled. Call Alicia when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
DOC - Permit Finaled  4/24/2020 DONE
per troy c
INSP-Sprinkler Rough-in/Hydro9/15/20199/16/20199/16/2019PPASS
DetailsTroy Cobbley
**Hydro and Tenting passed* MAS**
Hydro and tenting needed, rough passed last week. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro9/12/20199/13/20199/13/2019PPART
DetailsJim Page
Hydro was not ready, rough in inspection complete, piping between conditioned spaces approved for cover, not all tenting in place at time of inspection, cover is not approved where tenting is required.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro9/11/20199/12/20199/12/2019PFAIL
DetailsJim Page
Sprinkler head/heads at top of stairs do not extend past wall as shown on approved drawings.

Call Anthony before heading out Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Staff review9/11/20199/11/20199/11/2019 PASS
DetailsMark Stumbaugh
plan mod
PLANS/APPL TAKEN TO FRONT DESK  9/11/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee $150.00
Permit Ready to Issue  9/11/2019 DONE
CHANGE STATUS TO (ISS)  9/11/2019 DONE
plan mod-emailed Shelley taht this was in the inner office mail heading back her way
Plan Modification Accepted  9/11/2019 DONE
plan mod-changing heads in closet-assigned and took to Mark Stumbaugh
Plan assigned to (Stumbaugh)9/11/2019 9/11/2019 DONE
DetailsMark Stumbaugh
plan mod
INSP-Sprinkler Rough-in/Hydro9/4/20199/5/20199/5/2019PPART
DetailsTroy Cobbley
Plan mods need to be submitted showing the actual pipe routing, fittings and additional supply to second floor. Need tenting inspection when complete. Rough-in appears ok, just need the plans to match. Also the short piece at the top of the riser has been installed 3/4" instead of 1". No piping to be covered yet.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Permit Ready to Issue  8/27/2019 DONE
Issue and Courier  8/27/2019 DONE
emailed Shelley that permit is issued-called Carly to let know they coulld come pick up permits (they need to pick up all 12)
Staff review8/26/20198/26/20198/26/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)8/26/2019 8/26/2019 DONE
DetailsMark Stumbaugh
Miscellaneous action  8/26/2019 DONE
Emailed Shelley the NAF # and app-Carly with Thorp brought to us because Shelley is lout this week
PLANS/APPL TAKEN TO FRONT DESK  8/26/2019 DONE
DetailsMark Stumbaugh
Review Time 1hr
Application received  8/26/2019