Telephone call | | | 10/9/2000 | | DONE |
Kim Harrison
|
|
|
talked to Lillian ask her if she would fax over final cert. of value. She said she would let them know.mps
|
Final | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | PASS |
Gerry Varner
|
|
|
reinspection ###-#### final ok 9/8/2000 8:16:33 AM
|
Final | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PART |
Bill VanDegrift
|
|
|
###-#### seal floor at sumps, complete subwater drainage exterior, protect PEX at wall penatration above sumps, inadiquate urinal clearance 8/14/2000 1:44:23 PM temp occ ok 8/14/2000 1:44:39 PM
|
Final | 8/14/2000 | 8/11/2000 | 8/11/2000 | P | FAIL |
Gerry Varner
|
|
|
Added by Inspector: 323 On 8/14/2000 finish caulking - suprt pump lines - insall thermal expansion - provide proper clearance at urinal - permit and certify b.f.
|
Final | 8/14/2000 | 8/11/2000 | 8/11/2000 | A | FAIL |
Gerry Varner
|
|
|
Added by Inspector: 323 On 8/14/2000 not complete for inspection
|
Water and/or Sewer | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PART |
Bill VanDegrift
|
|
|
###-#### s/w ok replace electrical conduit on exterior pumped subsurface drain with approved materials 8/4/2000 4:18:56 PM
|
Water and/or Sewer | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/4/2000 material replacement ok on partial pumped subsurface drain
|
Plumbing Rough-in | 6/26/2000 | 6/27/2000 | 6/27/2000 | A | PASS |
Bill VanDegrift
|
|
|
###-####
|
Plumbing Rough-in | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PART |
Bill VanDegrift
|
|
|
john--###-#### r/i partial ri ok waste test ok need to run seperate 3/4 water to urinal ,lav. and retest water system 6/23/00 3:23:58 PM
|
Groundwork | 5/16/2000 | 5/17/2000 | 5/17/2000 | A | PASS |
Bill VanDegrift
|
|
|
###-####
|
Application received | | | 5/16/2000 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 5/16/2000 | | DONE |
|
|
|
|