Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberPLM00-02169
StatusFinaled
Name DE BEST PLUMBING INC
Site Address 3527 S FEDERAL WAY
Project NameFRED MEYER
Customer Number 
ePlanReview 
Description
6/21/00-$200,000.00-Hot and cold domestic water, waste and vents, plumbing fixtures as per boise city plans and specs. Initial cert. of value.mps 5-10-01 final cert
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  5/23/2001 DONE
when job value was entered a 0 was missed....20,000 should have been 200,000 lh
(F) Reprint permit  5/23/2001 DONE
Telephone call  5/10/2001 DONE
DetailsKim Harrison
Final2/15/20012/15/20012/15/2001APASS
DetailsLee Rice
Scheduled by Inspector: 309 On 2/15/2001 10:10:03 AM
Final2/14/20012/14/20012/14/2001PCANC
DetailsBill VanDegrift
###-####
Groundwork2/14/20012/14/20012/14/2001PCANC
DetailsLee Rice
Scheduled by Inspector: 309 On 2/14/2001 2:02:38 PM
Final2/14/20012/14/20012/14/2001PPART
DetailsLee Rice
Scheduled by Inspector: 309 On 2/14/2001 2:00:05 PM valves tested ok, still have one sink to connect up front 2/15/2001 7:45:20 AM
Final2/12/20012/13/20012/13/2001PFAIL
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 2/12/2001 5:11:30 PM ###-#### 2/12/2001 5:11:47 PM wont be ready till next week 2/13/2001 9:17:12 AM
Final2/12/20012/12/20012/12/2001PPART
DetailsBill VanDegrift
FN ERIC --###-#### CELL set all equipment, complete starbucks, test all bfp's, install pvb at hose reel soap disp. 2/12/2001 5:11:02 PM
Plumbing Rough-in2/2/20012/5/20012/5/2001PFAIL
DetailsBill VanDegrift
conference only ###-#### replace avbs with pvbs and extend 12" above piping on hose reels, turn rps and dcvas so valves are out, provide rp on fish case wash and proofers, move water softenor bypass downstream of rp, label all non-potable water piping, expose airgap in all equipment, rp on beverage mechine in breakroom, set all equipment 2/5/2001 5:25:56 PM
Final2/1/20012/2/20012/1/2001PCANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 02/01/2001 at 13:47:22. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/01/2001 at 15:49:04.
Final1/12/20011/16/20011/16/2001AFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 01/12/2001 at 08:36:09. Contact: ###-####. incomplete 1/16/2001 10:03:24 AM
Groundwork12/7/200012/8/200012/8/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/07/2000 at 15:17:52. Contact: ###-####. ti up front center unit 12/8/2000 9:14:44 AM
Water and/or Sewer11/15/200011/16/200011/16/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/15/2000 at 16:15:40. Contact: ###-####. , tests ok, hallway by restrooms r/i ok julery ri ok 11/16/2000 9:41:45 AM 11/16/2000 9:57:00 AM
Water and/or Sewer11/9/200011/9/200011/9/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/09/2000 at 10:17:32. Contact: ###-####.main restroom waste and vents water 11/9/2000 2:29:47 PM
Water and/or Sewer11/1/200011/2/200011/2/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 11/01/2000 at 16:16:03. Contact: ###-####. restroom area by coolers in back 11/2/2000 10:19:02 AM
Plumbing Rough-in10/30/200010/31/200010/31/2000APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 10/30/2000 water in island ok to cover island 10/31/2000 11:42:58 AM
Water and/or Sewer10/27/200010/30/200010/30/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 10/27/2000 at 14:54:56. Contact: ###-####. meat prep. area 10/30/2000 9:00:37 AM
Plumbing Rough-in10/30/200010/30/200010/30/2000PPART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 10/30/2000 fredmeyer debest island waste and vent water leaks 10/30/2000 4:37:09 PM
Water and/or Sewer10/26/200010/27/200010/27/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 10/26/2000 at 16:35:54. Contact: ###-####. 10/27/2000 2:32:01 PM floor sin in fish dept ok 10/27/2000 2:32:47 PM
Water and/or Sewer10/25/200010/26/200010/26/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 10/25/2000 at 16:31:54. Contact: ###-####.
Water and/or Sewer10/24/200010/25/200010/25/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 10/24/2000 at 16:20:43. Contact: ###-####.
Storm Drains10/13/200010/13/200010/13/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 10/13/2000 at 10:23:24. Contact: ###-####. trench 10/13/2000 3:04:06 PM drains in graden area should be ok when I get the revised plans 10/13/2000 3:04:30 PM
Roof Drains10/11/200010/11/200010/11/2000PFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 10/11/2000 at 10:43:12. Contact: ###-####. submit revised P-1 to pds for review by plumbing div. and attachment to approved plans. trench drains and backwater valves 10/11/2000 2:21:24 PM
Roof Drains9/29/200010/2/200010/2/2000AFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 09/29/2000 at 15:44:00. Contact: ###-####. regrade roof drain and overflow lines. 10/2/2000 9:06:42 AM
Plumbing Rough-in9/21/20009/22/20009/22/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 09/21/2000 at 10:30:46. Contact: ###-####. w&v test in rstroom 9/25/2000 8:28:38 AM
Roof Drains9/18/20009/18/20009/18/2000PPASS
DetailsLee Rice
Scheduled by a contractor via Hello! on 09/18/2000 at 11:15:32. Contact: ###-#### .only north side left









Groundwork9/8/20009/8/20009/8/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 09/08/2000 at 10:39:25. Contact: ###-####.two small bathrooms on west end and combo waste and vent by deli. 9/8/2000 4:42:12 PM
Groundwork9/6/20009/6/20009/6/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 09/06/2000 at 09:26:01. Contact: ###-####. witnessed grease interceptor test. and inspected. told foreman to use gravel all the way up under vent pipe fron interceptor. 9/6/2000 2:46:24 PM
Groundwork8/31/20008/31/20008/31/2000PPASS
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/31/2000 at 08:27:26. Contact: ###-####.
Roof Drains8/29/20008/30/20008/30/2000AFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/29/2000 at 16:24:51. Contact: ###-####.backgrade and lack of support on mainline roofdrain on east side ok. RD on west side not ready. 8/30/2000 2:17:50 PM
Groundwork8/30/20008/30/20008/30/2000PPASS
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/30/2000 at 11:22:14. Contact: ###-####.
Roof Drains8/30/20008/30/20008/30/2000PPASS
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/30/2000 at 11:22:32. Contact: ###-####.
Groundwork8/28/20008/29/20008/29/2000PPASS
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 8/28/2000
Groundwork8/28/20008/28/20008/28/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/28/2000 at 09:59:44. Contact: ###-####.
Groundwork8/24/20008/25/20008/25/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/24/2000 at 14:30:42. Contact: ###-####.
Groundwork8/22/20008/23/20008/23/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/22/2000 at 16:20:24. Contact: ###-####.
Groundwork8/16/20008/17/20008/17/2000PFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/16/2000 at 16:22:48. Contact: ###-####.leaks 8/17/2000 3:07:57 PM
Groundwork8/17/20008/17/20008/17/2000PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 8/17/2000 leaks fixed
Groundwork8/15/20008/15/20008/15/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/15/2000 at 08:39:17. Contact: ###-####. greae line from center of building to running trap and exterior ok with trap downstram of running tap 8/15/2000 5:00:55 PM
Groundwork8/11/20008/14/20008/14/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/11/2000 at 14:02:50. Contact: ###-####. combo w&v by south cent 8/14/2000 11:05:17 AM ral restrooms 8/14/2000 11:05:24 AM
Groundwork8/11/20008/11/20008/11/2000PFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/11/2000 at 11:21:16. Contact: ###-####. nr 8/14/00 12:30:22 PM
Groundwork7/26/20007/27/20007/27/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/26/2000 at 15:20:58. Contact: ###-####. rest room southeast 7/27/2000 9:32:56 AM
Water and/or Sewer7/20/20007/21/20007/21/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/20/2000 at 15:36:20. Contact: ###-####. LATE MORNING partial g 7/21/2000 11:34:11 AM w ok 7/21/2000 11:34:15 AM
Groundwork7/17/20007/18/20007/18/2000APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/17/2000 at 15:42:33. Contact: ###-####. late am
Groundwork7/13/20007/13/20007/13/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/13/2000 at 08:12:19. Contact: ###-####. lower end of main lines ok south central core 7/13/00 4:17:57 PM
Groundwork7/7/20007/7/20007/7/2000PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/07/2000 at 09:27:16. Contact: ###-####. deli area gw 7/7/00 2:32:27 PM
Groundwork6/30/20006/30/20006/30/2000PFAIL
DetailsLee Rice
Scheduled by a contractor via Hello! on 06/30/2000 at 08:53:28. Contact: ###-####. partial ok on shallow bakery grease area correction on deep grease lines to north to close to footing pads 7/3/00 10:30:49 AM
Application received  6/21/2000  
Issue & PRINT permit  6/21/2000 DONE