Plumbing Rough-in | 6/29/2000 | 6/30/2000 | 6/30/2000 | P | PASS |
Bill VanDegrift
|
|
|
Tom Allegrezza ###-####
|
Plumbing Rough-in | 6/26/2000 | 6/27/2000 | 6/27/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 6/26/00 8:30 conference with owner and jim storey conference on correction notice 6/27/00 10:29:06 AM
|
Final | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PASS |
Bill VanDegrift
|
|
|
tom- ###-#### fn
|
Plumbing Rough-in | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 6/26/00 additional piping not disclosed at prior ri prior inspection void, needs a pressure mixing valve at shower, listing for rubber tee at lav, vent washer and service sink wastes, if other than residential occ provide premis and thermol expantion protection and water service upgrade
|
Plumbing Rough-in | 6/21/2000 | 6/22/2000 | 6/22/2000 | P | PART |
Bill VanDegrift
|
|
|
FOR HOMEOWNER TOM--- -###-#### R/I basement bathroom seems ok but covered, vent basement sink 6/22/00 1:56:11 PM
|
Application received | | | 6/21/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/21/2000 | | DONE |
|
|
|
|