Final | 3/20/2003 | 3/21/2003 | 3/21/2003 | A | PASS |
Bill VanDegrift
|
|
|
###-#### final ok 3/21/2003 9:45:30 AM
|
DOC - Permit Finaled | 3/21/2003 | 3/21/2003 | 3/21/2003 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 3/21/2003 9:45:31 AM
|
Final | 3/13/2003 | 3/17/2003 | 3/17/2003 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### pipe t&p drain outside 3/17/2003 8:34:32 AM
|
Plumbing Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | PASS |
Bill VanDegrift
|
|
|
call first ###-####
|
Plumbing Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | FAIL |
Bill VanDegrift
|
|
|
r/i perry ###-#### call 1st before insp move wb trap above floor, test waste and vent system, water was on already, isolate water in floor by stairs, misc. hangers required 2/28/2001 10:38:19 AM
|
Application received | | | 8/14/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2000 | | DONE |
|
|
|
|