Telephone call | | | 10/8/2002 | | DONE |
|
|
|
GC's final cert has a value of 179,589.00 for this portion of the TI and very low value on the shell.
|
Final | 10/1/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Stan Johnson
|
|
|
###-####
|
DOC - Permit Finaled | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Stan Johnson
|
|
|
Finaled by inspector at 10/2/2001 1:54:28 PM
|
Final | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | NR |
Stan Johnson
|
|
|
becky ###-####
|
Final | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | NR |
Stan Johnson
|
|
|
for fn ada standards to be met as per stru. inspector 9/14/2001 12:51:34 PM
|
CHANGE STATUS TO (I) | | | 9/13/2001 | | DONE |
|
|
|
stan wanted me to change status
|
Water and/or Sewer | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 08:29:43. Contact: ###-####.backflow pvc cannot be used above ground 8/31/2001 12:16:59 PM
|
Water and/or Sewer | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 08:29:43. Contact: ###-####.backflow pvc cannot be used above ground 8/31/2001 12:16:59 PM
|
DOC - Permit Finaled | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Stan Johnson
|
|
|
Finaled by inspector at 8/31/2001 12:17:19 PM
|
Other | 8/22/2001 | 8/23/2001 | 8/23/2001 | P | DONE |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 11:41:00. Contact: ###-####.sprinkler backflow required to be broght to code with drain valve and remove rp from underground 8/22/2001 4:03:02 PMwalkthrough looks ok waiting for cabinets for sinks and lavs hookup dish washer in kitchen 8/22/2001 4:04:52 PM
|
Other | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | DONE |
Stan Johnson
|
|
|
PROFIT Mtg. today @ 1:30told sup. to have debest schu walk t hrough 8/21/2001 3:19:20 PM
|
Plumbing Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 14:25:50. Contact: ###-####.rough in complete 6/4/2001 12:42:56 PM
|
Plumbing Rough-in | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 10:38:59. Contact: ###-####.1st and 2nd floor grid A and D 1-6 south side.
|
Storm Drains | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 15:20:50. Contact: ###-####. bui 4/18/2001 2:26:21 PM lding storm drains finished and tested 4/18/2001 2:27:13 PM
|
Storm Drains | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 09:42:32. Contact: ###-####. partial grid gand h roof drain on g overflow leaks will repair and do with balance of drains on 4/18/01 4/17/2001 1:49:41 PM
|
Groundwork | 3/15/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 16:40:02. Contact: ###-####.
|
Groundwork | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 08:05:47. Contact: ###-####.8"roof drin lines under ground 3/7/2001 2:51:26 PM
|
Groundwork | 2/7/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 10:30:17. Contact: ###-####. ground work in side gym
|
Groundwork | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 16:26:05. Contact: ###-####. gym bathrooms 12/22/2000 8:57:59 AM
|
Groundwork | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 14:51:09. Contact: ###-####. grease trap test ok 12/21/2000 10:16:06 AM
|
Groundwork | 12/19/2000 | 12/19/2000 | 12/19/2000 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 08:18:08. Contact: ###-####. bathroom group womens 12/19/2000 1:49:58 PM
|
Water and/or Sewer | 12/14/2000 | 12/15/2000 | 12/15/2000 | A | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 16:51:36. Contact: ###-####. water line from meter to building
12/15/2000 9:47:47 AM
|
Groundwork | 12/13/2000 | 12/13/2000 | 12/13/2000 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 10:30:28. Contact: ###-####. class room bath groups off two branches 12/13/2000 1:48:53 PM
|
Groundwork | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 09:44:09. Contact: ###-####. grease line to tank 12/11/2000 12:39:05 PM
|
Groundwork | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 08:32:35. Contact: ###-####.
|
Application received | | | 10/18/2000 | | |
|
|
|
|
Issue & PRINT permit | | | 10/18/2000 | | DONE |
|
|
|
|