Telephone Call | | | 2/20/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 2/12/2003 | 2/12/2003 | 2/12/2003 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 2/12/2003 8:47:06 AM
|
PLM-Aging Inspection | 2/12/2003 | 2/12/2003 | 2/12/2003 | | PASS |
Bill VanDegrift
|
|
|
final ok 2/12/2003 8:47:03 AM
|
Telephone call | | | 6/1/2001 | | DONE |
Kim Harrison
|
|
|
labor and materials
|
Final | 5/3/2001 | 5/3/2001 | 5/3/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 07:06:28. Contact: ###-####. already done 5/3/2001 10:23:21 AM
|
Final | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 04/19/2001 at 09:30:20. Contact: ###-####.
|
Final | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 08:46:16. Contact: ###-####. df in grden area S-trapped, calk df, trap primers by 3/26/2001 3:34:07 PM garden area not complete, lable non-potable water in garden area, water piping insulation in garden incomplete, calk janitor sink. 3/26/2001 3:39:27 PM
|
Groundwork | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 14:44:38. Contact: ###-####. relocate eyewash in loading dock no test on 3/19/2001 9:46:07 AM
|
Groundwork | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 3/19/2001 9:45:35 AM 3/19/2001 2:52:41 PM 3/19/2001 2:52:44 PM gw, ri ok for relocated emergency eyewash in loading dock area 3/19/2001 2:53:17 PM
|
Final | 3/12/2001 | 3/13/2001 | 3/13/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 14:33:47. Contact: ###-####. pipe garden area roof drains, set d.f. by garden area, eye waah by loading dock, prv, breakroom fixtures, lav in womens restroom, lable non-otable water in garden area, cut roofing membrane from roof drain bodies. 3/13/2001 12:04:15 PM temp occ ok 3/13/2001 12:10:30 PM
|
Other | 2/13/2001 | 2/14/2001 | 2/14/2001 | A | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 14:15:34. Contact: ###-####.oked water main and lines to rooftop swamp coolers. Lee 2/14/2001 10:00:47 AM
|
Roof Drains | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 16:25:52. Contact: ###-####. one 8
one 8", one 4"
' 2/9/2001 11:05:42 AM
|
Roof Drains | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 2/9/2001 11:04:52 AM test on rdi front complete 2/9/2001 4:01:54 PM
|
Plumbing Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 2/6/2001 4:15:25 PM rd front right column ok 2/7/2001 11:46:59 AM
|
Roof Drains | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 10:42:08. Contact: ###-####. left col ok right has a bad pipe 2/6/2001 4:15:57 PM
|
Roof Drains | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 08:33:35. Contact: ###-####. garden area drain connection to the site system ok 2/2/2001 3:23:25 PM
|
Plumbing Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 09:15:46. Contact: ###-####. should be ready in the morning 1/23/2001 5:04:43 PM
|
Plumbing Rough-in | 1/23/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 1/23/2001 5:05:09 PM ###-#### 1/23/2001 5:05:28 PM retroom area ri ok 1/24/2001 12:17:49 PM
|
Groundwork | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 08:32:30. Contact: ###-####. rain drain in garden area 12/7/2000 3:17:43 PM
|
Groundwork | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 13:17:54. Contact: ###-####.ss connections to mains ok 12/5/2000 12:01:45 PM
|
Groundwork | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 17:02:39. Contact: ###-####.
|
Groundwork | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 16:49:14. Contact: ###-####.
|
Groundwork | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 09:58:43. Contact: ###-####. no test 11/20/2000 4:53:58 PM
|
Groundwork | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 11/20/2000 test failed again on main line most likely under roadway
|
Groundwork | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 14:33:46. Contact: ###-####. no test on 11/17/2000 11:15:46 AM
|
Groundwork | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/17/2000 don't seem like this thing will even hold water 11/17/2000 4:05:20 PM
|
Groundwork | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/15/2000 hme depot test failed 11/16/2000 11:55:32 AM
|
Groundwork | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/16/2000 test failed 11/16/2000 2:17:25 PM
|
Groundwork | 11/13/2000 | 11/15/2000 | 11/15/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 16:12:34. Contact: ###-####.test failed 11/15/2000 4:36:34 PM
|
Application received | | | 10/20/2000 | | |
|
|
|
|
Issue & PRINT permit | | | 10/20/2000 | | DONE |
|
|
|
|