Telephone call | | | 3/1/2002 | | DONE |
|
|
|
requested 2/22/02 and 2/27/02
|
Final | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 14:40:54. Contact: ###-####. temp occ ok still need to know if the sewer pump station is running, no one here knows 9/6/2001 9:58:25 AM
|
DOC - Permit Finaled | 9/6/2001 | 9/6/2001 | 9/6/2001 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 9/6/2001 4:47:19 PM
|
Final | 8/30/2001 | 8/31/2001 | 8/31/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 09:57:18. Contact: ###-####. install r.p. on water line serving roof top units, thermol expantion protection required, test all backflow preventors, sewer pump station must be operational prior to perm. occ. 8/31/2001 4:12:17 PM
|
Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 12:04:18. Contact: ###-####.
|
Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 8/27/2001 2:35:45 PM signed temp occ. Will wait for Bill for final final 8/27/2001 3:53:39 PM
|
Med/Gas Systems | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 09:55:43. Contact: ###-####. called in the wrong inspection wanted fuel gas inspection 8/14/2001 2:17:37 PM
|
Water and/or Sewer | 8/6/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 13:21:47. Contact: ###-####. water system and waste over office ok to cover still needs to tune up the waste and vent system in the shop restroom area. 8/7/2001 1:53:07 PM
|
Plumbing Rough-in | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 7/25/2001 3:12:14 PM partial ri ok 2nd floor in walls waste and vent , water complete 7/26/2001 8:30:07 AM
|
Plumbing Rough-in | 7/24/2001 | 7/25/2001 | 7/25/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 14:55:32. Contact: ###-####. transition bands required, nail plates 7/25/2001 3:11:37 PM
|
Water and/or Sewer | 7/18/2001 | 7/18/2001 | 7/18/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 07:14:23. Contact: ###-####. add additional 1 1/2" branch to feed downstream of 1st floor mens restroom group, pick up shop restroom off new branch 7/18/2001 10:19:18 AM
|
Plumbing Rough-in | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 07:20:48. Contact: ###-####. restroom ceiling 1st floor under stairs ok to cover 7/11/2001 9:54:35 AM
|
Plumbing Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | FAIL |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 08:05:34. Contact: ###-####.increase waterline size to flushomters in one bathroom per plan. 7/11/2001 9:02:00 AM
|
Plumbing Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 07:54:16. Contact: ###-####.
|
Roof Drains | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 11:06:34. Contact: ###-####.
|
Roof Drains | 6/13/2001 | 6/13/2001 | 6/13/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 09:27:11. Contact: ###-####. s. side 6/13/2001 4:42:12 PM
|
Roof Drains | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:33:54. Contact: ###-####. 2 east end sets ok , 2nd from s.w. corner ok, need nw corner r.d., 2nd from n.w. corner r.d. and 2nd from s.e.corner r.d. 6/12/2001 3:15:51 PM
|
Storm Drains | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 08:33:45. Contact: ###-####. 4 west overflow drains 5/31/2001 2:13:33 PM
|
Groundwork | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 07:20:24. Contact: ###-####. restroom in shop gw ok 5/30/2001 8:39:32 AM
|
Water and/or Sewer | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 11:47:17. Contact: ###-####. water service ok 5/7/2001 11:34:37 AM
|
Groundwork | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 15:04:04. Contact: ###-####. added barsink, not in conflict with restroom fllting area gw ok 3/19/2001 1:36:27 PM
|
Groundwork | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 08:51:46. Contact: ###-####. engineer must review piping inrestroom group under main support footing for 2nd floor. response to be sent to the jobsite and presented to the structural inspector for review prior to pouring footing. do not cover ground work. 3/15/2001 4:37:28 PM
|
Groundwork | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 08:25:53. Contact: ###-####. deep main thru bldg. and 1st restroom gw ok 3/14/2001 3:41:07 PM
|
Water and/or Sewer | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 09:44:47. Contact: ###-####. water service stub out 3/5/2001 3:30:37 PM
|
Application received | | | 3/2/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 3/2/2001 | | DONE |
|
|
|
|