PLM-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | PASS |
Bill VanDegrift
|
|
|
|
DOC - Permit Finaled | 8/6/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 8/6/2001 9:48:23 AM
|
Final | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-####
|
Final | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | FAIL |
Bill VanDegrift
|
|
|
partial fn - basement bath will not finish until new swr line- scott ###-#### cap abandoned waste line in basement bath, seal all 3 wall penatrations in basement bath, the baement bath is future, wont be active till sewer line in run in the street and connection made, an additional permit will be required at that time. 4/27/2001 2:50:08 PM
|
Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | PASS |
Jim Johnson
|
|
|
SCOTT ###-#### --BACK IS OPEN FOR ACCESS R/I
|
Plumbing Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | NR |
Bill VanDegrift
|
|
|
back unlocked-- scott ###-#### r/i
|
Groundwork | 3/20/2001 | 3/20/2001 | 3/20/2001 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 3/20/2001 9:18:32 AM gw ok
|
Application received | | | 3/19/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 3/19/2001 | | DONE |
|
|
|
|