Final | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 08:46:23. Contact: ###-####. final ok with t&p drain turned down at exterior 5/3/2001 2:45:18 PM
|
DOC - Permit Finaled | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 5/3/2001 2:46:52 PM
|
Plumbing Rough-in | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:03:54. Contact: ###-####.
|
Application received | | | 3/23/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 3/23/2001 | | DONE |
|
|
|
|