DOC - Permit Finaled | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Stan Johnson
|
|
|
Finaled by inspector at 5/9/2001 4:39:41 PM
|
Plumbing Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Stan Johnson
|
|
|
###-#### after 4pm
|
Final | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | NH |
Stan Johnson
|
|
|
###-####
|
Plumbing Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | FAIL |
Stan Johnson
|
|
|
Bryan ###-####pex not approved for relief line also relief line to be graded except in this case must be graded 4/6/2001 11:44:47 AM om 4/6/2001 11:44:59 AMfrom higest point above water heater to outside 1/8" hole to be drilled at lowest point 4/6/2001 11:47:14 AM
|
Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 4/6/2001 11:49:08 AM
|
Application received | | | 4/5/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 4/5/2001 | | DONE |
|
|
|
|