Final | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Jim Johnson
|
|
|
###-####
|
DOC - Permit Finaled | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 6/8/2001 2:45:41 PM
|
Plumbing Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 4/17/2001 11:47:38 AM
|
Plumbing Rough-in | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 11:28:24. Contact: ###-####. pex water line need's to be 12 inches from can light's 4/16/2001 2:01:09 PM
|
Plumbing Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | FAIL |
Jim Johnson
|
|
|
Scott ###-#### air test for water failed waste test ok need to move pex water line's twelve inche's from can light's 4/13/2001 12:38:17 PM
|
Issue & PRINT permit | | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/12/2001 | | |
|
|
|
|