Telephone Call | | | 2/20/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 12/18/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 12/18/2002 8:21:07 AM
|
PLM-Aging Inspection | 12/18/2002 | 12/18/2002 | 12/18/2002 | | PASS |
Bill VanDegrift
|
|
|
this is for the underground only and it is complete final ok 12/18/2002 8:21:05 AM
|
Groundwork | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PART |
Bill VanDegrift
|
|
|
DONNY ###-#### GRID # G 5,6,7 trench drains 6/7/2002 10:59:45 AM
|
| | | 6/6/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
|
| | | 6/6/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)
(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
|
Groundwork | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | PART |
Bill VanDegrift
|
|
|
grid work for a, b, & 6 --###-####- heidi waste only, needs to increase trap to a 4" 5/24/2002 1:52:11 PM
|
Override - Parcel Holds | | | 5/24/2002 | | |
|
|
|
|
Groundwork | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PART |
Bill VanDegrift
|
|
|
###-#### trench drain main s.w. test ok 5/17/2002 10:09:40 AM
|
Override - Parcel Holds | | | 5/16/2002 | | |
|
|
|
|
Other | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 4/29/2002 3:29:01 PM met with debest and engineer, lathon, etc. on tee pulling
|
Groundwork | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | PART |
Bill VanDegrift
|
|
|
###-#### teri basement broiler room vent test ok , grease and ss extentions into basement east end ok 3/19/2002 11:48:55 AM
|
Override - Parcel Holds | | | 3/18/2002 | | |
|
|
|
|
Groundwork | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 08:32:56. Contact: ###-####. partial gw and domestic water test 3/15/2002 2:59:46 PM
|
Groundwork | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 16:46:26. Contact: ###-####. trench drains in bagage area, another 30' icw in basement, ventsby equipment pads in basement. 3/13/2002 12:10:19 PM
|
Plumbing Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | NR |
Bill VanDegrift
|
|
|
###-#### grids waste and vent and domestic water grids D, 2B, 82 & 3
|
Plumbing Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 14:58:54. Contact: ###-####. restroom ri basement, partial grease waste test ok 3/7/2002 2:48:23 PM
|
Plumbing Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 12:04:52. Contact: ###-####. partialri ok waste in basement ceiling for public restrooms 3/4/2002 4:03:49 PM
|
Groundwork | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PART |
Bill VanDegrift
|
|
|
for grids 9 & e-donny ###-#### partial gw ok 3/1/2002 2:51:22 PM
|
Groundwork | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 09:22:18. Contact: ###-####. doubled up on inspection requests 3/1/2002 2:51:52 PM
|
Groundwork | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 10:23:39. Contact: ###-####. part g/w ok, 4" from basement stubbed twards eastern grease interceptor 2/19/2002 12:05:25 PM
|
Groundwork | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 09:42:26. Contact: ###-####. 1st floor section a grids e and f point and 3 partial gw ok s.s. and osw main, need a vent from oil trap 1/30/2002 3:53:51 PM
|
PLM-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | NR |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 11/19/2001 | 11/20/2001 | 11/20/2001 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 16:10:22. Contact: ###-####. SECTION C BETWEEN GRIDS 6 & 7
|
Groundwork | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 11/20/2001 2:48:32 PM col C grid 6-7 restrooms ok
|
Groundwork | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 15:15:56. Contact: ###-####.FIRE PUMP ROOM ; ok 11/5/2001 2:03:44 PM
|
Groundwork | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 10:47:28. Contact: ###-####.
|
Groundwork | 10/30/2001 | 10/31/2001 | 10/31/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 15:41:13. Contact: ###-####. Grids 1 through 4 and B through C.8 around 2:30 2 floor sinks and a trench drain 10/31/2001 2:06:08 PM
|
Groundwork | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/29/2001 at 13:21:42. Contact: ###-####. between grids 1& 3 B.5 through D.5 one section passed , the larger section had a pin hole in it and I'll reinspect it in the morning 10/29/2001 4:38:32 PM
|
Groundwork | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/29/2001 4:42:47 PM boiler room south west 10/30/2001 9:44:22 AM
|
Groundwork | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 15:58:07. Contact: ###-####. mech.pit underground drainage 10/26/2001 10:18:07 AM
|
Groundwork | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 14:22:51. Contact: ###-####. deep waste in basement grids D.25 / 2.75 thru 6.5 test ok 9/25/2001 9:28:50 AM
|
Groundwork | 9/20/2001 | 9/21/2001 | 9/21/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 14:24:43. Contact: ###-####. main trunk line from sump area on west end of building to halfway across basement test ok. 9/21/2001 4:34:42 PM
|
Groundwork | 9/20/2001 | 9/21/2001 | 9/20/2001 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 13:30:35. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/20/2001 at 14:22:32.
|
Application received | | | 9/20/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 9/20/2001 | | DONE |
|
|
|
|