Final | 1/22/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 1/22/2002 9:17:58 AM final ok
|
DOC - Permit Finaled | 1/22/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 1/22/2002 9:18:37 AM
|
Final | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | FAIL |
Bill VanDegrift
|
|
|
fn insp per lee pipe water heater t&p drain to utility room floor 1/18/2002 3:55:30 PM
|
CHANGE STATUS TO (I) | | | 1/18/2002 | | DONE |
|
|
|
per lee change status to issue
|
Plumbing Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 12:23:29. Contact: ###-####.
|
DOC - Permit Finaled | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Gerry Varner
|
|
|
Finaled by inspector at 10/9/2001 5:38:59 PM
|
Final | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | CANC |
Jim Johnson
|
|
|
###-#### KATHY
|
Groundwork | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 10/2/2001 12:07:23 PM
|
Groundwork | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | FAIL |
Jim Johnson
|
|
|
###-#### test failed ( test two inch cast iron under concret slab ) 10/1/2001 4:37:45 PM
|
Application received | | | 9/24/2001 | | |
|
|
|
|
Issue & PRINT permit | | | 9/24/2001 | | DONE |
|
|
|
|
Issue & PRINT permit | | | 9/24/2001 | | DONE |
|
|
|
|