Permit Information
Permit NumberPLM02-00340
StatusFinaled
Name RM MECHANICAL
Site Address 8000 S FEDERAL WAY
Project NameMICRON
Customer Number0202324
ePlanReview 
Description
sewer waste and vent potable water non potable water fixtures, roof drains per initial cert of value $629,634.00//final cert $661,989.00
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice PLM5/23/20035/23/20034/7/2004 DONE
Second Notice has not been responded to.
(F) Reprint permit  4/7/2004 DONE
Second Notification5/8/20035/8/20035/23/2003 DONE
First Notice has not been responded to.
First Notice 10/11/20025/8/2003 DONE
Details
DOC - Permit Finaled10/11/200210/11/200210/11/2002PPASS
DetailsBill VanDegrift
Finaled by inspector at 10/11/2002 3:23:48 PM
Final10/11/200210/11/200210/11/2002PPASS
DetailsBill VanDegrift
les -###-#### all done but minor lableing, casy minchue with micron will see its complete 10/11/2002 3:21:13 PM
Final8/8/20028/8/20028/8/2002PPART
DetailsBill VanDegrift
temp occ ok 8/8/2002 2:57:21 PM
Final8/7/20028/8/20028/8/2002ANR
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/07/2002 at 15:52:01. Contact: . still missing parts 8/8/2002 10:29:49 AM
Final8/7/20028/7/20028/7/2002PNR
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/07/2002 at 11:23:11. Contact: ###-####. still need to complete chemical injection piping 8/7/2002 3:51:45 PM
Final7/19/20027/22/20027/22/2002ANR
DetailsBill VanDegrift
###-#### went out on this one friday, no temp on the rest of the building untill they an handle the waste from the chemical storage area. 7/22/2002 9:32:48 AM
Final7/22/20027/22/20027/22/2002PNR
DetailsBill VanDegrift
same old thing 7/22/2002 4:59:01 PM
Final7/17/20027/17/20027/17/2002PNR
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/17/2002 at 10:30:16. Contact: ###-####. pipe insulation incomplete, set all fixtures, turn water on to all fixtures, frp behind janitor sinks, fire water heaters, broken lav in office, set all emergency showers, c.o. plugs and covers,roofing membrane in roof drains, janitor sink strainer 7/17/2002 4:49:28 PM
Final7/12/20027/12/20027/12/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/12/2002 at 09:58:49. Contact: ###-####. temp occ for office area grids 2 thru 9, a thru d, install janitor sink and its water heater, turn oon water to all lavs and drinking fountains, breakroom sink incomplete, temp occ ok. 7/12/2002 3:43:17 PM
Plumbing Rough-in6/20/20026/21/20026/21/2002APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 6/20/2002 1:48:34 PM iw test ok fab/subfab to chem area 6/21/2002 10:52:43 AM
Plumbing Rough-in6/19/20026/20/20026/20/2002ANR
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 06/19/2002 at 16:07:33. Contact: ###-####.
Plumbing Rough-in6/20/20026/20/20026/20/2002PNR
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 6/20/2002 9:12:42 AM
Storm Drains6/12/20026/12/20026/12/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 06/12/2002 at 08:38:32. Contact: ###-####. partal rd and of test ok over chem storage area 6/12/2002 4:07:51 PM
Storm Drains6/10/20026/11/20026/11/2002APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 06/10/2002 at 11:58:15. Contact: ###-####. north side high roof to west side discharge test ok 6/11/2002 10:47:13 AM
Storm Drains6/7/20026/7/20026/7/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 06/07/2002 at 07:57:57. Contact: ###-####.
Plumbing Rough-in6/4/20026/5/20026/5/2002APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 06/04/2002 at 14:31:13. Contact: ###-####. restrooms office area 6/5/2002 11:30:45 AM
Water and/or Sewer5/24/20025/28/20025/28/2002APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/24/2002 4:45:18 PM i w test ok 5/28/2002 11:35:43 AM
Plumbing Rough-in5/28/20025/28/20025/28/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/28/2002 at 08:17:52. Contact: ###-####. solvent waste test ok 5/28/2002 4:07:22 PM
Storm Drains5/28/20025/28/20025/28/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/28/2002 at 09:16:56. Contact: ###-####. tempered water test ok 5/28/2002 4:08:11 PM
Water and/or Sewer5/28/20025/28/20025/28/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/28/2002 at 09:17:47. Contact: ###-####. r.d. o.f. c line west ok 5/28/2002 4:07:53 PM
Plumbing Rough-in5/23/20025/24/20025/24/2002APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/23/2002 4:43:50 PM test on IW from tank discharge to dlb contaimed waste 5/24/2002 9:37:12 AM
Plumbing Rough-in5/24/20025/24/20025/24/2002PPART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/24/2002 9:37:31 AM part gw for future fish tank waste only 5/24/2002 1:41:54 PM
Plumbing Rough-in5/24/20025/24/20025/24/2002PNR
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/24/2002 3:17:52 PM
Plumbing Rough-in5/22/20025/23/20025/23/2002PNR
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/22/2002 5:03:32 PM jason 5/23/2002 15min. turned intoo an hour and still no test 5/23/2002 4:44:50 PM
Plumbing Rough-in5/22/20025/23/20025/23/2002APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/22/2002 5:03:53 PM temp water test failed, potable water test ok, r.d.and o.f. s.e. tower test ok, 4" vent by chem room test ok. 5/23/2002 9:56:41 AM
Plumbing Rough-in5/22/20025/22/20025/22/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/22/2002 at 09:16:21. Contact: ###-####. partial iw test 5/22/2002 5:04:13 PM
Roof Drains5/22/20025/22/20025/22/2002PCANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/22/2002 at 10:43:09. Contact: ###-####.
Water and/or Sewer5/22/20025/22/20025/22/2002PCANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/22/2002 at 10:44:02. Contact: ###-####.
Storm Drains5/17/20025/17/20025/17/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/17/2002 at 07:38:08. Contact: ###-####. r.d. and o.f. north east tower test ok 5/17/2002 4:18:40 PM
Storm Drains5/15/20025/15/20025/15/2002PFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/15/2002 at 09:11:38. Contact: ###-####. test on r.d. and o.f. failed n.e. tower 5/15/2002 4:04:18 PM
Water and/or Sewer5/15/20025/15/20025/15/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/15/2002 at 09:10:56. Contact: ###-####. this was for an inside inspection 5/15/2002 4:02:12 PM
Plumbing Rough-in5/15/20025/15/20025/15/2002PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/15/2002 at 09:10:15. Contact: ###-####. restroom south central waste test failed , potable water from main shutoff to potable r.p. and two non-potable water r.ps. test ok 5/15/2002 4:03:36 PM
Water and/or Sewer5/13/20025/14/20025/14/2002APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 5/13/2002 3:54:34 PM south side r.d., waste in s.e. restroom test ok 5/14/2002 8:44:11 AM
Storm Drains5/13/20025/13/20025/13/2002PNH
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 05/13/2002 at 09:29:17. Contact: ###-####. couldnt get ahold of les, called twice, showed up at 3:45, no one around, rescheduled. 5/13/2002 3:54:12 PM
Plumbing Rough-in3/25/20023/26/20023/25/2002ACANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 03/25/2002 at 11:53:12. Contact: ###-####. THEY ARE GOING TO WAIT UNTIL THEY HAVE WATER LES ###-####
Application received  2/12/2002  
Issue & PRINT permit  2/12/2002 DONE