Final | 4/26/2002 | 4/26/2002 | 4/26/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 4/26/2002 10:48:45 AM
|
DOC - Permit Finaled | 4/26/2002 | 4/26/2002 | 4/26/2002 | A | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 4/26/2002 10:52:20 AM
|
Final | 4/22/2002 | 4/24/2002 | 4/24/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 08:36:18. Contact: ###-####. need to move pex piping from gas vent 6 inches or better called contractor and left message 4/24/2002 5:35:21 PM
|
Final | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 09:28:31. Contact: . have premise protection double check tested and certified need to provide trap primer on floor drain in pan under water heater 4/23/2002 4:38:44 PM
|
Plumbing Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 10:53:25. Contact: ###-####.
|
Plumbing Rough-in | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 08:57:52. Contact: ###-####.drain test failed backflow required on comeceral building 3/1/2002 1:00:15 PM
|
Application received | | | 2/28/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 2/28/2002 | | DONE |
|
|
|
|