Telephone Call | | | 2/20/2003 | | DONE |
|
|
|
|
Final | 9/9/2002 | 9/10/2002 | 9/10/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 15:54:32. Contact: ###-####.
|
DOC - Permit Finaled | 9/10/2002 | 9/10/2002 | 9/10/2002 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 9/10/2002 4:19:40 PM
|
Plumbing Rough-in | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 14:44:13. Contact: ###-####.
|
Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 08:04:42. Contact: ###-####. upc 905.3 need to pipe floor sink vent to 6 inches above flood level of water closets need to fix leak above 3 inch cross talked to plumber on job site 7/11/2002 4:02:15 PM
|
Water and/or Sewer | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 08:00:43. Contact: ###-####.
|
Groundwork | 4/19/2002 | 4/19/2002 | 4/19/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 4/19/2002 9:51:14 AM
|
Water and/or Sewer | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/18/2002 at 11:16:46. Contact: ###-####. this is a groundwork not ready 4/19/2002 9:56:39 AM
|
Application received | | | 4/18/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 4/18/2002 | | |
|
|
|
|