PostCard Mailed | | | 5/10/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 4/3/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 3/5/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 2/1/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 1/4/2003 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 12/6/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Sprinkler (Final) | 4/19/2002 | 4/22/2002 | 4/22/2002 | A | FAIL |
Bill VanDegrift
|
|
|
use 160 psi at tie in, needs pvb tested 4/22/2002 10:16:03 AM
|
Sprinkler (Final) | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 4/22/2002 10:16:16 AM tie in ok, needs testing 4/22/2002 3:48:45 PM
|
Application received | | | 4/19/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/19/2002 | | DONE |
|
|
|
|