Telephone Call | | | 11/5/2002 | | DONE |
|
|
|
faxed 10/09/02
|
Water and/or Sewer | 5/20/2002 | 5/20/2002 | 5/20/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 5/20/2002 11:36:10 AM
|
DOC - Permit Finaled | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 5/20/2002 11:37:18 AM
|
Water and/or Sewer | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | PART |
Jim Johnson
|
|
|
BILL ###-#### test interceptor note told bitterroot personal on job site 5/17/2002 4:32:19 PM
|
Water and/or Sewer | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | PART |
Jim Johnson
|
|
|
swr line-bill -###-#### sewer line test ok need to replumb interceptor with approved material,s need cleanout,s vent,s and approved gas tight lid,s note told bitterroot foreman interceptor need to be plumb by licensed plumber 5/16/2002 4:38:11 PM
|
Water and/or Sewer | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 330 On 5/13/2002 1:28:38 PM please drawa map, this permit is for both buildings, 1900 and 1950 cole for some reason. bill test on new sewer line ok -ok to tie building sewer with existing sand and grease trap to new sewer as per conversation with walt bumgarner approval 5/15/2002 12:11:39 PM
|
Water and/or Sewer | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PART |
Bill VanDegrift
|
|
|
###-#### BILL needs testing for 190 s. cole 5/13/2002 4:17:03 PM
|
Application received | | | 4/25/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 4/25/2002 | | |
|
|
|
|