Final | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Bill VanDegrift
|
|
|
fn insp re-insp -backflow ###-#### dan
|
DOC - Permit Finaled | 5/9/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 5/9/2002 10:33:28 AM
|
Sprinkler (Final) | 5/6/2002 | 5/8/2002 | 5/8/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 5/6/2002 2:45:04 PM ok to cover, test dcva 5/8/2002 8:29:58 AM
|
Sprinkler (Final) | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### DAN BACKFLOW needs a shutoff and drain at tie in 5/6/2002 2:44:41 PM
|
Application received | | | 5/6/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 5/6/2002 | | DONE |
|
|
|
|