Final | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 12:01:59 PM. Contact: ###-####. final ok 5/9/2003 11:54:53 AM
|
DOC - Permit Finaled | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 5/9/2003 11:54:55 AM
|
Plumbing Rough-in | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 20:58:47. Contact: ###-####. ri ok, 10/23/2002 9:54:51 AM
|
Other | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 15:16:58. Contact: ###-####. r/i conference prior to gluing 10/4/2002 9:48:57 AM
|
Other | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/19/2002 at 11:55:27. Contact: ###-####.
|
Plumbing Rough-in | 9/12/2002 | 9/13/2002 | 9/13/2002 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 19:22:20. Contact: ###-####. ok to cover master bathScheduled by a contractor via Hello! on 09/12/2002 at 19:22:20. Contact: ###-####. 9/13/2002 10:38:56 AM
|
Other | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 11:43:20. Contact: ###-####. ri conference, use sancross at dlb lavs, use 3x2 combo and santee for tub drain instead of the side inlet on its back , also went over the 2nd floor bath waste. 9/9/2002 10:22:48 AM
|
Other | 8/14/2002 | 8/15/2002 | 8/15/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/14/2002 at 19:13:56. Contact: ###-####. ri conference, sems to know what to do for the 1st floor restroom, will call for conference on the new 2nd floor restroom when its framed up, talked to him about adding a recirc to the existing pb water system and sugested replacing with pex. may just rough in recirc at this time. 8/15/2002 9:37:13 AM 8/15/2002 9:37:43 AM
|
Issue PAID IN FULL permit | | | 7/25/2002 | | DONE |
|
|
|
|
Application received | | | 7/8/2002 | | |
|
|
|
|