Final | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Bill VanDegrift
|
|
|
JUSTIN ###-####
|
DOC - Permit Finaled | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 8/29/2002 5:00:53 PM
|
Final | 8/28/2002 | 8/28/2002 | 8/28/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 09:23:41. Contact: ###-####. get as much clearance between t&p drain and water heater flue as possible 8/28/2002 2:11:07 PM
|
Plumbing Rough-in | 8/5/2002 | 8/6/2002 | 8/6/2002 | P | PASS |
Bill VanDegrift
|
|
|
###-####
|
Issue & PRINT permit | | | 8/5/2002 | | DONE |
|
|
|
|
Application received | | | 8/5/2002 | | |
|
|
|
|