Final | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Jim Johnson
|
|
|
###-####
|
DOC - Permit Finaled | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 11/8/2002 3:20:19 PM
|
Final | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | PART |
Jim Johnson
|
|
|
###-#### ben need waterheater pan,s installed caulk pedestal lav at wall called contractor will recall when corrected 11/7/2002 3:25:07 PM
|
Plumbing Rough-in | 8/30/2002 | 9/3/2002 | 9/3/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 17:26:28. Contact: ###-####.
|
Plumbing Rough-in | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 18:22:52. Contact: ###-####. increase water piping from 3/4 to 1 inch through water heater . increase drain to 4 inch up to first water closet branch drain as per table 7-5 note 4 in upc 2000 called contractor will recall when corrected 8/30/2002 12:04:50 PM
|
Application received | | | 8/29/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 8/29/2002 | | |
|
|
|
|