Other | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 08:45:30. Contact: ###-####.
|
Final | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 08:55:28. Contact: ###-####.
|
DOC - Permit Finaled | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 9/27/2002 3:40:57 PM
|
DOC - Permit Finaled | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 9/27/2002 3:41:06 PM
|
Plumbing Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | FAIL |
Jim Johnson
|
|
|
r/i- john- ###-####--ext 34-- pipe t&p to approved location pipe hose bibb,s with approved material and fitting,s make approved connection at building sewer support building drain every 4 foot and pex water piping every 32 inches 9/17/2002 11:59:27 AM
|
Issue & PRINT permit | | | 9/16/2002 | | |
|
|
|
|
Application received | | | 9/16/2002 | | |
|
|
|
|