Final | 12/6/2002 | 12/6/2002 | 12/6/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 05:55:07. Contact: ###-####.
|
DOC - Permit Finaled | 12/6/2002 | 12/6/2002 | 12/6/2002 | A | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 12/6/2002 11:16:31 AM
|
Water and/or Sewer | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | FAIL |
Jim Johnson
|
|
|
###-#### ext 31 need to repipe t&p to out side the way t&P is piped now is trapped called contractor will recall when corrected 11/22/2002 12:35:17 PM
|
Issue permit | | | 11/21/2002 | | DONE |
|
|
|
|
Application received | | | 11/21/2002 | | |
|
|
|
|