(F) Reprint permit | | | 6/6/2003 | | DONE |
|
|
|
|
Third Notice PLM | 5/23/2003 | 5/23/2003 | 5/27/2003 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notification | 5/8/2003 | 5/8/2003 | 5/23/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/9/2003 | 5/8/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 4/9/2003 | 4/9/2003 | 4/9/2003 | A | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 4/9/2003 8:32:41 AM
|
Final | 4/9/2003 | 4/9/2003 | 4/9/2003 | A | PASS |
Jim Johnson
|
|
|
|
Final | 4/8/2003 | 4/8/2003 | 4/8/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 11:12:59 AM. Contact: ###-####. need sprinkler certification before final 4/8/2003 2:33:07 PM
|
Final | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/4/2003 at 8:20:36 AM. Contact: ###-####. need to have premise protection certified 2. expansiontank under sized need to be st-12 3. need heat trap nipples on water heater hot and cold side 4. need to pipe t&p to approved drain or to outside 5.need strainer for floor drain by water heater 6. need protective cover,s on handicapp laves 7.fix leak on east downstaires water closet 8. need to permit sprinkler backflow protection and inspected before final inspection 4/4/2003 3:07:03 PM
|
PLM-Aging Inspection | 4/2/2003 | 4/2/2003 | 4/2/2003 | | PASS |
Jim Johnson
|
|
|
work still in progress 4/2/2003 8:20:54 AM
|
Plumbing Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PASS |
Jim Johnson
|
|
|
###-####
|
Application received | | | 1/31/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 1/31/2003 | | DONE |
|
|
|
|